5/6 is an answer to this question.....
Answer:
36 + 36 = 72
Step-by-step explanation:
Answer:
2.4 hours
Step-by-step explanation:
Let total work = X
Rate of work done = X ÷ time
Rate of A = X/4
Rate of B = X/6
If they work together, rate is the sum of their individual rates, i.e.
X/4 + X/6
= (3X + 2X)/12 (taking LCM)
=5X/12
Rate = X/time
5X/12 = X/time
time = X÷(5X/12)
time = X × 12/(5X)
time = 2.4 hours
Shortcut:
Product of individual times/sum of individual times
= (4×6)/(4+6)
=24/10
=2.4 hours
Answer:
2,6,18,54
How I got this answer:
Each term after the first is found by multiplying by a fixed, non-zero number called a common ratio.
step by step:
2×3=6
6×3=18
18×3=54
The common ratio is 3.
Let the first number be = x
Then the second number = 2x
The third number = 2x - 5
Their sum = 55
This can be written in an equation as =
x + 2x + 2x - 5 = 55
= x + 2x + 2x = 55 + 5 ( transposing -5 from LHS to RHS changes -5 to +5 )
= x + 2x + 2x = 60
= 5x = 60
= x = 60 ÷ 5 ( transposing ×5 from LHS to RHS changes ×5 to ÷5 )
= x = 12
The first number = x = 12
The second number = 2x = 2 × 20 = 24
The third number = 2x - 5 = 24 - 5 = 19
Therefore , the three numbers are 12 , 24 and 19 .