1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
maksim [4K]
3 years ago
10

Problem 11-93 Waltner Corporation s management... Waltner Corporation's management reports that its average delivery cycle time

is 25 days, its average throughput time is 7.7 days, its manufacturing cycle efficiency (MCE) is 0.43, its average move time is 0.3 day, and its average queue time is 3.00 days. Required: a. What is the wait time
Mathematics
1 answer:
Marat540 [252]3 years ago
3 0

Complete question is;

Waltner Corporation's management reports that its average delivery cycle time is 25 days, its average throughput time is 7.7 days, its manufacturing cycle efficiency (MCE) is 0.43, its average move time is 0.3 day, and its average queue time is 3.00 days. Required: a. What is the wait time?

b. What is the process time?

c. What is the inspection time?

Answer:

A) Wait time = 17.3 days

B) Process time = 3.311 days

C) Inspection time = 0.789 days

Step-by-step explanation:

A) we are given;

Delivery cycle time = 25 days

throughput time = 7.7 days

The formula for wait time is calculated from;

Delivery time = wait time + throughput time

So, wait time = Delivery time - throughput time

Wait time = 25 - 7.7 = 17.3 days

B) The process time is calculated from;

MCE = Process time/throughput time

So, process time = MCE x throughput time

We are given MCE = 0.43,thus, and we already know throughput time. Thus;

Process time = 0.43 x 7.7 = 3.311 days

C) The inspection time is gotten from;

throughput time = Process time + Inspection time + Move time + Queue time

Making inspection time the subject;

inspection time = throughput time - Process time - Move time - Queue time

Move time = 0.3 days

Queue time = 3 days.

Thus;

inspection time = 7.7 - 3.311 - 0.3 - 3.3 = 0.789 days

You might be interested in
PLEASE HELP ASAP!!!!!
Kitty [74]
The total would be 180 degrees because angles on a straight line would always add up to 180.
(3x+31)+(2x-6)=180
5x+25=180
     -25   -25
5x=155
/5     /5
x=31
5 0
3 years ago
Read 2 more answers
Osvoldo has a goal of getting at least 30%, percent of his grams of carbohydrates each day from whole grains. Today, he ate 220
Phantasy [73]
Yeah because he was at least 80% and when you add the grain and carbon that was total. Then divide the carbon. It will be 80%
8 0
3 years ago
A library shelf has <br> 3<br> 3 types of books
AfilCa [17]

Answer:

that library has only 3 books? it needs to open a book raising fund

6 0
3 years ago
What is -5.8+ (2.5) Evaluate expression
sweet [91]

-5.8 + (-2.5)

is just 5.8 - 2.5

Which is -8.3

8 0
3 years ago
A dog groomer could clean six dogs an hour, how many could they clean five-tents of an hour
Nina [5.8K]
6 times 5 is 30 so 30/10=3 dogs in 5/10 of an hour hooe it helped
5 0
3 years ago
Other questions:
  • Find the solution to the system of equations.
    9·2 answers
  • A die is thrown. What is the probability of getting 6?<br>(a) 0<br>b 1/6<br>c 1/2<br>d 1​
    13·1 answer
  • 8 divided by 2 (2+2). 1 or 16
    11·1 answer
  • Show that 9 x 2.8 is 25.2
    7·2 answers
  • Find a. Round it to the nearest tenth
    7·1 answer
  • Plzzz helppp with mathh
    9·2 answers
  • Citing drastic differences between her school and the white school across the
    9·2 answers
  • A quilt is made of 12 squares of equal size. Each square measures 15 cm by 15 cm.
    10·2 answers
  • A roof rises 24 feet vertically and 14 feet horizontally. What is the slope of the​ roof?
    9·1 answer
  • GEOMETRY Find the diameter d of the circle in the figure at the right. Round to the nearest tenth if necessary.
    6·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!