Answer:
(a) 2 degree celsius per hour
(b) 3 degree celsius per hour.
Step-by-step explanation:
From the question,
(a) Avearge rate of rise in temperature per hour(T') = Rise in temperature(T)/Time required for the rise(t).
T' = T/t.................... Euqation 1
Rise in temperature (T) = 4 degree celsius, t = 10.00 am to noon = 2 hours.
Substitute into equation 1
T' = 4/2
T' = 2 degree celsius per hour.
(b) Also,
Average rate of fall in temperature per hour (T') = Fall in temperature (T)/Time(t)
T' = T/t
Given: T = 6 degree celsius, t = 3:00 pm to 5:00 pm = 2 hours
T' = 6/2
T' = 3 degree celsius per hour
<span> D) Train A by a factor of 1.1
</span>Train A: <span>17/35</span><span> = 34.6</span>
<span>Train B: </span>Rate<span> is the </span>slope<span> of the </span>equation, 31.35
Thus,<span>34.6/31.35</span><span> = 1.1036</span>
Answer:
6
Step-by-step explanation:

Answer:
m ≥ 0
Step-by-step explanation:
Since the cost is represented by c = 0.12m, the domain should be a positive number, this is because number of minutes can't be written in negative. Therefore, the most reasonable number for the domain would be the set of positive whole numbers which means, m≥0.
Answer:
18
Step-by-step explanation:
2x9=18