1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
GREYUIT [131]
3 years ago
11

Any help if possible Thank you ❤

Mathematics
1 answer:
Inessa [10]3 years ago
7 0
4/3 * pi * r^3
4/3 * 3.14 * r^3
4/3 * 3.14 * 9.5^3
4/3 *3.14 * 857.375
314/75 * 857.375

Answer: 1076863/300 or 3589.54333
You might be interested in
Calls to a customer service center last on average 2.8 minutes with a standard deviation of 1.4 minutes. An operator in the call
Natali5045456 [20]

Answer:

The expected total amount of time the operator will spend on the calls each day is of 210 minutes.

Step-by-step explanation:

Normal Probability Distribution:

Problems of normal distributions can be solved using the z-score formula.

In a set with mean \mu and standard deviation \sigma, the z-score of a measure X is given by:

Z = \frac{X - \mu}{\sigma}

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.

n-values of normal variable:

Suppose we have n values from a normally distributed variable. The mean of the sum of all the instances is M = n\mu and the standard deviation is s = \sigma\sqrt{n}

Calls to a customer service center last on average 2.8 minutes.

This means that \mu = 2.8

75 calls each day.

This means that n = 75

What is the expected total amount of time in minutes the operator will spend on the calls each day

This is M, so:

M = n\mu = 75*2.8 = 210

The expected total amount of time the operator will spend on the calls each day is of 210 minutes.

6 0
3 years ago
What is 0.8% of 35 plz help
ANEK [815]

Answer:

0.28

Step-by-step explanation:

5 0
3 years ago
Read 2 more answers
Is a rational number? Why or why not?<br><img src="https://tex.z-dn.net/?f=%20%5Csqrt%7B7%7D%20" id="TexFormula1" title=" \sqrt{
lions [1.4K]

Answer:

No, it is a irrational number

Step-by-step explanation:

5 0
3 years ago
Read 2 more answers
Which statement is true about the expressions below?
Zielflug [23.3K]
Is there a attachment because I don’t see anything
7 0
3 years ago
Help!!!!!!!<br> Really need it
AfilCa [17]
The word is B_SA _B I don’t know the rest
6 0
3 years ago
Other questions:
  • Find f(x) + g(x) when f(x) = 2x^2 + x and g(x) = 3x + 2
    5·2 answers
  • Need help ASAP 20 POINTS!
    13·1 answer
  • Find the measure of Angle 3. measure of angle 1 = x measure of angle 2 = x-6
    8·1 answer
  • Given the sequence in the table below, determine the sigma notation of the sum for term 4 through term 15
    12·2 answers
  • How are percent error and percent change similar
    10·1 answer
  • Use the identity (x+y)(x^2−xy+y^2)=x^3+y^3 to find the sum of two numbers if the product of the numbers is 28, the sum of the sq
    15·2 answers
  • The perimeter of the triangle is 34 cm. Solve for x.
    5·2 answers
  • Need help fast please thanks
    7·1 answer
  • What is the distance between (2, 5) and (2, -7)?
    15·1 answer
  • 874 x 12 - 1,000 · 4³ = ? ajutatima pls
    10·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!