Answer:
572.5
Step-by-step explanation:
A=6ah + 3√(3) a²= 6·8·5+3√(3)·8²≈572.55376
a is base length and h is height
Answer:
uit is the mixed number of decimal point
Given the amount of water needed to fill the cement dam and the water pump rate, the time needed to fill the dam is 400 minutes or 6hours 40minutes.
Option B)6h 40min is the correct answer.
<h3>How long does it take to fill the dam?</h3>
Given that;
- Amount of water needed to fill the dam A = 30000 litres
- Pump rate r = 75 litres per minute
- Time needed to fill the dam T = ?
To determine how long it take to fill the dam, we say;
Time need = Amount of water needed ÷ Pump rate
T = A ÷ r
T = 30000 litres ÷ 75 litres/minute
T = 400 minutes
Note that; 60min = 1hrs
Hence,
T = 6hours 40minutes
Given the amount of water needed to fill the cement dam and the water pump rate, the time needed to fill the dam is 400 minutes or 6hours 40minutes.
Option B)6h 40min is the correct answer.
Learn more word problems here: brainly.com/question/2610134
#SPJ1
Answer:
Chromebook: 0.25 percent per minute
iPhone: 0.5 percent per minute
1) The phone
2) Faster by 0.25 percent per minute, or 1 percent every four minutes
3) The phone
4) 25 percent more
5) The phone
L=n-2, W=4+L=n+2
A=LW, since L=n-2 and W=n+2 we have:
A=(n-2)(n+2) so it could be this expression or the expansion
A=n^2-4