1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Elodia [21]
3 years ago
10

Researchers are interested in the effect of a certain nutrient on the growth rate of plant seedlings. Using a hydroponics grow p

rocedure that utilized water containing the nutrient, they planted six tomato plants and recorded the heights of each plant 14 days after germination. Those heights, measured in millimeters, were as follows: 53.1, 60.2, 60.6, 62.1, 64.4, 68.6.
1. What is the point estimate of the population mean height of this variety of seedling 14 days after germination? Do not round your final answer.

2. Given a margin of error of 5.4 mm, construct a 95% confidence interval for the population mean height. Enter only the lower limit for your confidence interval rounded to one decimal place.

3.Given a margin of error of 5.4 mm, construct a 95% confidence interval for the population mean height. Enter only the upper limit for your confidence interval rounded to one decimal place.

4. Why is a point estimate alone usually insufficient for statistical inference?

A. A point estimate alone is insufficient because the sampling distribution is not centered at the parameter.
B. An interval estimate gives us a sense of the accuracy of the point estimate whereas a point estimate alone does not.
C. The point estimate usually falls outside the confidence interval.
D.The point estimate has a large standard deviation compared to other estimators.
Mathematics
2 answers:
alexandr402 [8]3 years ago
7 0

Answer:

1. the point estimate:mean =61.5 mm

standard deviation = 5.143 mm

2. the lower limit of the confidence interval =50.9 mm

3. the upper limit of the confidence interval =72.1 mm

4. B. An interval estimate gives us a sense of the accuracy of the point estimate whereas a point estimate alone does not.

Step-by-step explanation:

1. An estimate of a population parameter,such as mean or standard deviation, based on a single number is called a point estimate.

for this question; the point estimate of the mean and standard deviation of the height of 6 samples are calculated

mean = (53.1 + 60.2+ 60.6+ 62.1+ 64.4+68.6.)/6 = 369/6 = 61.5 mm

standard deviation = 5.143 mm

variance = 26.45

2. margin of error, σₓ  of 5.4 mm

confidence interval of 95% gives a Zc of 1.96 from the table of confidence coefficient

confidence interval, µ =

µ= x ±zc σx = 61.5 ± 1.96*5.4 = 61.5 ± 10.584

the lower limit of the confidence interval =50.9 mm

3. the upper limit of the confidence interval =72.1 mm

4.

a point estimate alone usually insufficient for statistical inference

B. An interval estimate gives us a sense of the accuracy of the point estimate whereas a point estimate alone does not.

Ede4ka [16]3 years ago
4 0

Answer:

1) The mean calculated for this case is \bar X=61.5

2)  61.5-5.4=56.1

3) 61.5+5.4=66.9

4) B. An interval estimate gives us a sense of the accuracy of the point estimate whereas a point estimate alone does not.

Because with the confidence interval we know the confidence level of the interval, and the limits for the parameter at some significance level.  

Step-by-step explanation:

Previous concepts

A confidence interval is "a range of values that’s likely to include a population value with a certain degree of confidence. It is often expressed a % whereby a population means lies between an upper and lower interval".

The margin of error is the range of values below and above the sample statistic in a confidence interval.

Normal distribution, is a "probability distribution that is symmetric about the mean, showing that data near the mean are more frequent in occurrence than data far from the mean".

Part 1

In order to calculate the mean and the sample deviation we can use the following formulas:  

\bar X= \sum_{i=1}^n \frac{x_i}{n} (a)  

s=\sqrt{\frac{\sum_{i=1}^n (x_i-\bar X)}{n-1}} (b)  

The mean calculated for this case is \bar X=61.5

The sample deviation calculated s=5.143

\mu population mean (variable of interest)

n=6 represent the sample size  

Part 2

The confidence interval for the mean is given by the following formula:

\bar X \pm ME   (1)

So if we have the margin of error 5.4mm we can find the lowr limit like this:

61.5-5.4=56.1

Part 3

61.5+5.4=66.9

Part 4

B. An interval estimate gives us a sense of the accuracy of the point estimate whereas a point estimate alone does not.

Because with the confidence interval we know the confidence level of the interval, and the limits for the parameter at some significance level.

You might be interested in
A scale drawing of a rectangular prism is 10cm by 8.5 cm. If the actual field has dimension of 40m by 34m, what scale can be use
Bad White [126]
The answer will be D. Hope it help!
5 0
3 years ago
I need the answer pls
Pie

Answer:

2

Step-by-step explanation:

Subtract-4 from 6

6 0
3 years ago
The question is in the picture.
dangina [55]
<h2><u>Part A:</u></h2>

Let's denote no of seats in first row with r1 , second row with r2.....and so on.

r1=5

Since next row will have 10 additional row each time when we move to next row,

So,

r2=5+10=15

r3=15+10=25

<u>Using the terms r1,r2 and r3 , we can find explicit formula</u>

r1=5=5+0=5+0×10=5+(1-1)×10

r2=15=5+10=5+(2-1)×10

r3=25=5+20=5+(3-1)×10

<u>So for nth row,</u>

rn=5+(n-1)×10

Since 5=r1 and 10=common difference (d)

rn=r1+(n-1)d

Since 'a' is a convention term for 1st term,

<h3><u>⇒</u><u>rn=a+(n-1)d</u></h3>

which is an explicit formula to find no of seats in any given row.

<h2><u>Part B:</u></h2>

Using above explicit formula, we can calculate no of seats in 7th row,

r7=5+(7-1)×10

r7=5+(7-1)×10 =5+6×10

r7=5+(7-1)×10 =5+6×10 =65

which is the no of seats in 7th row.

8 0
3 years ago
Change the following quantity into the indicated unit.
mafiozo [28]

Answer:

11.8 in.

Step-by-step explanation:

8 0
4 years ago
Two linear equations are shown. A coordinate grid with 2 lines. The first line is labeled y equals StartFraction one-third EndFr
Lorico [155]

Answer:

(7,\frac{13}{3})

Step-by-step explanation:

we have

<em>The equation of the first line</em>

y=\frac{1}{3}x+2 ------> equation A

<em>The equation of the second line</em>

y=\frac{4}{3}x-5 ------> equation B

Solve the system of equations by elimination

Multiply equation A by -4 both sides

(-4)y=(-4)(\frac{1}{3}x+2)

-4y=-\frac{4}{3}x-8 --------> equation C

Adds equation B and equation C

y=\frac{4}{3}x-5\\-4y=-\frac{4}{3}x-8\\--------\\y-4y=-5-8\\-3y=-13\\y=\frac{13}{3}

<em>Find the value of x</em>

substitute the value of y

\frac{13}{3}=\frac{1}{3}x+2

\frac{1}{3}x=\frac{13}{3}-2

Multiply by 3 both sides

x=13-6

x=7

therefore

The solution to the system of equations is the point (7,\frac{13}{3})

5 0
3 years ago
Read 2 more answers
Other questions:
  • The demand equation for the Roland portable hair dryer is given as follows where x (measured in units of a hundred) is the quant
    7·1 answer
  • Function question<br><br>read the graph then solve
    10·1 answer
  • Percent that equals 7/8
    15·2 answers
  • The number of girls in a class varies directly with the number of boys in the class. If a class contains seven boys and 21 girls
    13·1 answer
  • Whoever gets this right first gets a BRAINLYEST
    6·1 answer
  • A bag contains green yellow and black marbles out of the 100 marbles in the bag 35 marbles are green and 15 or yellow what perce
    15·1 answer
  • Write the equation that shows 40 is 8 times more than 5
    10·1 answer
  • 2,000.h for h = 0.004<br> 2,000 h =
    10·1 answer
  • Giving brainiest please help
    12·1 answer
  • A car travels a certain distance at x km/h in 12 hours. If it travels of the way at km/h and the rest at 4x km/h, how many hours
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!