Answer:
Nothing, just exit out of it
Explanation:
I pretty sure it's a form but don't count me on it.
Answer:
public class num9 {
public static void main(String[] args) {
int sum =0;
int num =5;
for(num =5; num<=500; num+=5){
System.out.println(num);
sum +=num;
}
System.out.println(sum);
}
}
Explanation:
- Declare and initialize the variables sum and num
- Use a for loop with the condition for(num =5; num<=500; num+=5) Since the loop will increment by 5 and run from 5 to 500
- Within the loop, add num to sum at each iteration
- Print all elements on seperate lines
- Outside the loop, print the final value of sum
Create a for loop
Answer:
The correct answer is C) With respect to PERT and CPM, slack is the amount of time a task may be delayed without changing the overall project completion time.
Explanation:
The CPM (Critical Path Method) method is frequently used in the development and control of projects whose tasks have a fixed duration while the PERT (Program Evaluation and Review Techniques) method is a set of techniques with the same purpose but that allows to work with tasks with estimated probability duration but not deterministic.
Both methods are based on developing a complete scheme that includes all the tasks of a project linked to each other according to their sequence, determining the duration and analyzing different ways of reconfiguring the task planning to optimize the use of the resources of according to the general objectives of the project.
There are tasks that to start performing them must have been completed one or more previous tasks. The overall duration of the project is determined by the Critical Path, which is the sequence of tasks of greater duration. The tasks belonging to the critical path have to be carried out with special care because delays in them would cause delays in the total achievement of the project. That is why these tasks have no slack.
The rest of the tasks have some slack, which is determined by the time that a previous task can be delayed without delaying the total time of completion of the project, that is, not exceeding the duration determined by the critical path.
That is that why we say that the <em>slack</em><em> is the amount of time a task may be delayed without changing the overall project completion time</em>.
the answer to the question is a Embedded ( I just learned this like a month ago so im pretty sure it right :))