Answer:
option 3 = 3.75
Step-by-step explanation:
x is 3.75
.
Answer:
201.2
Step-by-step explanation:
area= s^2n
----------- ( 180)
4+9 ---------
( n )
Area equals S squared n over four plus nine times ( 180 over n )
What i did was add 40 to 120 to get 160. then i devided 160 by the 6.25 she got per hour and i got 25.6 and rounded to 26 which would end up being the least amount of hours she could’ve worked. so 26 is the answer i’m pretty sure
So if you want to fit the y-intercepts or "b", on the y-axis you should go by 25's [0, 25, 50, 75, 100...]
If the x-axis <u>does not have to</u> follow the same pattern (25's), you should go by 5's [0, 5, 10, 15, 20...]
y = 7x + 50
y = 2x + 175
First I would plot the y-intercepts for each equation, then plot a few points with x = 5, 10, 15 Then draw a straight line.
The point where the two lines meet/cross paths is your solution. It should be (25, 225) The x-axis is the number of miles, and the y-axis is the total cost. So Truck driver A and B would arrive/be at the same place/meet in 25 miles at the same cost of $225
10 ft i think. 5/9 of 180 (which is 12 x 15) is 100 and 10 x 10 is 100