1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
postnew [5]
3 years ago
8

Which device or software application detects errors in system configurations?

Computers and Technology
1 answer:
amm18123 years ago
5 0
Error-correcting code memory
You might be interested in
The item in this illustration that is highlighted is _____.
Svetlanka [38]

Answer:the title bar

Explanation:

3 0
3 years ago
Read 2 more answers
4. The NIMS Management Characteristic of Chain of Command and Unity of Command means that each person: A. Continues to report di
Kipish [7]

Answer:

The answer is "Option C"

Explanation:

This system facilitates the establishment by state, Municipality, Militaristic, Provincial and local governments of a detailed, national framework for disaster response. This command structure of each person refers to only a single ICS boss because of NIMS management, and the wrong option can be defined as follows:

  • In option A, The Continuous report describes your daily details.
  • In option B, These reports are not in one ICS supervisor.
  • In option D, It can not assign different competences.
8 0
3 years ago
How bridges are built over water
Black_prince [1.1K]
It’s all depending on what method
4 0
2 years ago
Write a C++ program that produces a simple personalized adventure game called Lost Fortune about a band of explorers that finds
Natasha2012 [34]

Answer:

Detailed answer is given :

8 0
2 years ago
In the welding operations of a bicycle manufacturer, a bike frame has a long flow time. The set up for the bike frame is a 7 hou
mestny [16]

Answer:

Bike Frame Flow Time

The value-added percentage of the flow time for this bike frame is:

= 46.

Explanation:

a) Data and Calculations:

Bike Frame Flow Time:

Setup time = 7 hours

Processing time = 6 hours

Storage time = 7 hours

Flow time of the bike frame = 13 hours (7 + 6)

Value-added percentage of the flow time for this bike frame = 6/13 * 100

= 46%

b) Flow time represents the amount of time a bicycle frame spends in the manufacturing process from setup to end.  It is called the total processing time. Unless there is one path through the process, the flow time equals the length of the longest process path.  The storage time is not included in the flow time since it is not a manufacturing process.

8 0
2 years ago
Other questions:
  • Who does Potholes effect in South Africa?
    15·1 answer
  • When tcp/ip was developed, the host table concept was expanded into a hierarchical name system for matching computer names and n
    5·1 answer
  • What are the five resources paid for by local taxes
    15·1 answer
  • When projecting a presentation on a large screen, what should your minimum font size be?
    6·2 answers
  • Which are technical and visual demands that need to be considered when planning a project? Choose three answers
    10·1 answer
  • One way to prepare for filing the PROFILE is to:
    12·2 answers
  • Two routers connect with a serial link, each using its S0/0/0 interface. The link is currently working using PPP. The network en
    6·1 answer
  • Hey guys im just curious.... whats ur favorite number
    6·2 answers
  • Which of the following are acceptable to share? Check all of the boxes that apply.
    13·1 answer
  • Please help I’ll give 10 points
    6·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!