Do both as equation it will make it easier for her
Answer:
$433.84
Step-by-step explanation:
First, find the amount of money Jennifer earned for regular work time:
8.50 x 43 = 365.50
Then, find the amount of money Jennifer earned for overtime work:
10.50 x 6.5 = 68.25
Finally, add them:
365.50 + 68.25 = 433.75
Out of the four options,
A. 99 cm B. 105.98 cm C. 90 cm D. 104.5 cm,
option A is the correct answer.
Because 1 m = 100 cm and this is the nearest approximation. Thus, the<span>A student used A tape measures to estimate the length of a meterstick manufactured to he exactly 1 meter. </span>
Using an exponential function, it is found that the value of the function when x = 4 is of f(4) = 15.95.
<h3>What is an exponential function?</h3>
It is modeled by:

In which:
- b is the rate of change, as a decimal.
In this problem, we have that f(-1)=5, hence:


a = 5b
We also have that f(7)=32, hence:

Since a = 5b:

![b = \sqrt[8]{\frac{32}{5}}](https://tex.z-dn.net/?f=b%20%3D%20%5Csqrt%5B8%5D%7B%5Cfrac%7B32%7D%7B5%7D%7D)
b = 1.2612.
a = 5b = 5 x 1.2612 = 6.306.
Hence the function is given by:

Then, when x = 4, we have that:

More can be learned about exponential functions at brainly.com/question/25537936
#SPJ1
It’s currently in point-slope form. To convert...
y-7=-3/4x-(15/4)
y=-3/4x-15/4+7
y=(-3/4)x+(13/4)