Any changes done to the software during the operational phase of the software before project wind up is called as maintenance is a false statement.
<h3>What are operational phases?</h3>
The operational phase is known to be that phase in course of the making or construction where a given flow of the stresses is known to be mad in the medium via which the tunnel advances that is deviated.
Hence, Any changes done to the software during the operational phase of the software before project wind up is called as maintenance is a false statement because any change that is made to the software after it is deployed is known as maintenance.
Learn more about software from
brainly.com/question/28400365
#SPJ1
Lenny might be either suspended
Or might be failed in that particular course
Answer:
This is a multicolinearity problem and the student should determine the variable(s) that cause(s) the problem and remove it.
Explanation:
This information means that there exists a linear combination between the independent variables. The problem might have developed due to multicolinearity producing almost perfectly linearly dependent columns.
This could also be as a results of single matrix created when the student use an incorrect indicator variables and included an additional indicator column which created linearly dependent columns.
Answer:
The governor found a way to free Sostre without assessing whether or not he was guilty or innocent of drug crime in buffalo.
Explanation:
B is your answer meteoroids are small space rocks they are usually pieces of asteroids or comets