1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Andru [333]
3 years ago
11

Which expression has the value of 8? A. -12 - 4 B -16 - 8 C -4 + 12 D 8 + (-18)

Mathematics
2 answers:
Natali5045456 [20]3 years ago
5 0

Answer:

C -4 + 12

HOPE THIS HELPS ;) YOU GET an A!!!!!


Step-by-step explanation:


Alex3 years ago
4 0

Answer:

C -4 + 12

Step-by-step explanation:

-4 + 12 means 12 - 4 = 8

Hope that helps

You might be interested in
Select the correct answer.
EleoNora [17]

Answer:

Option (B)

Step-by-step explanation:

There are two lines on the graph representing the system of equations.

First line passes through two points (-3, 1) and (-2, 3).

Slope of the line = \frac{y_2-y_1}{x_2-x_1}

                           = \frac{3-1}{-2+3}

                       m = 2

Equation of the line passing through (x', y') and slope = m is,

y - y' = m(x - x')

Equation of the line passing through (-3, 1) and slope = 2 will be,

y - 1 = 2(x + 3)

y = 2x + 7 ----------(1)

Second line passes through (0, 1) and (-1, 4) and y-intercept 'b' of the line is 1.

Let the equation of this line is,

y = mx + b

Slope 'm' = \frac{y_2-y_1}{x_2-x_1}

               = \frac{4-1}{-1-0}

               = -3

Here 'b' = 1

Therefore, equation of the line will be,

y = -3x + 1 ---------(2)

From equation (1) and (2),

2x + 7 = -3x + 1

5x = -6

x = -\frac{6}{5}

x = -1\frac{1}{5}

From equation (1),

y = 2x + 7

y = -\frac{12}{5}+7

  = \frac{-12+35}{5}

  = \frac{23}{5}

  = 4\frac{3}{5}

Therefore, exact solution of the system of equations is (-1\frac{1}{5},4\frac{3}{5}).

Option (B) will be the answer.

5 0
3 years ago
A video game developer wants to know how long it takes people to finish playing their new game. They surveyed a random sample of
Nadya [2.5K]

Based on the data, the median time it takes players to complete the game is 1148 minutes.

<h3>What is the median?</h3>

It is the mathematical value that is the middle when values are sorted.

<h3>How to find the median time?</h3>
  • Organize the values

457 - 548- 866 - 952 - 976 - 1037 - 1148 - 1235 - 1245- 1431-1486 - 1759 - 1864

Identify the value of the middle

Considering there are 13 values, the value of the middle is the value number 7 or 1148.

Note: This question is incomplete because the data is missing, below I attached the missing section,

Learn more about median time in: brainly.com/question/7493103

7 0
2 years ago
Subtract. Write the answer in standard form. (12+4i)−(3−7i)
LiRa [457]

Answer:

9+11i

Step-by-step explanation:

12-3=9

4i-(-7i)=11

8 0
3 years ago
Read 2 more answers
Pls help! (put a joke in ur awnser)
djverab [1.8K]

Answer:

r⁶

Step-by-step explanation:

Cancel the common factors or r⁹ and r³

3 0
3 years ago
Read 2 more answers
A certain plant runs three shifts per day. Of all the items produced by the plant, 50% of them are produced on the first shift,
Snezhnost [94]

Answer:

0.2941 = 29.41% probability that it was manufactured during the first shift.

Step-by-step explanation:

Conditional Probability

We use the conditional probability formula to solve this question. It is

P(B|A) = \frac{P(A \cap B)}{P(A)}

In which

P(B|A) is the probability of event B happening, given that A happened.

P(A \cap B) is the probability of both A and B happening.

P(A) is the probability of A happening.

In this question:

Event A: Defective

Event B: Manufactured during the first shift.

Probability of a defective item:

1% of 50%(first shift)

2% of 30%(second shift)

3% of 20%(third shift).

So

P(A) = 0.01*0.5 + 0.02*0.3 + 0.03*0.2 = 0.017

Probability of a defective item being produced on the first shift:

1% of 50%. So

P(A \cap B) = 0.01*0.5 = 0.005

What is the probability that it was manufactured during the first shift?

P(B|A) = \frac{P(A \cap B)}{P(A)} = \frac{0.005}{0.017} = 0.2941

0.2941 = 29.41% probability that it was manufactured during the first shift.

6 0
3 years ago
Other questions:
  • Maria will spin the arrow on the spinner 2 times. What is the probability that the arrow will stop on the same letter twice? 19
    6·1 answer
  • 7/9 converted to a decimal
    5·2 answers
  • GIVING BRAINLIEST. A parabola opens to the left. Which could be the equation of the parabola?
    9·1 answer
  • The squirrel stored seven more than three times as many nuts as the chipmunk. The chipmunk stored x acorns.Write an expression t
    15·2 answers
  • Find the dimensions of a rectangle whose area is 306cm2 and whose perimeter is 70 cm
    6·1 answer
  • A jet travels from Chicago to Kansas City at a speed of 440 knots. If it takes a plane 3 hr longer to fly from Kansas city to Ch
    14·1 answer
  • Use two mixed numbers to write an equation with a sum of 4 1/4
    11·2 answers
  • PLS HELP ON THIS QUESTION I WILL MARK YOU AS BRAINLIEST IF YOU KNOW THE ANSWER!!
    9·2 answers
  • Write the equation of the line that passes through the point (-4, -9) and has a slope of 1/2​
    7·2 answers
  • PLS HURRY DOUBLE-CHECKING<br><br>what is: 94 ÷ 17​
    11·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!