1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
stepan [7]
3 years ago
15

Help I really don’t know the answer to this

Mathematics
1 answer:
maksim [4K]3 years ago
8 0

Answer:u gotta show the graph

Step-by-step explanation:

You might be interested in
Each square below represents one whole.
Kipish [7]

Answer:

75%

Step-by-step explanation:

<em>Each square represents one whole and there are 3 parts out of the 4 that are shaded. </em>

<em>3/4 = 75%</em>

4 0
3 years ago
Read 2 more answers
How many 1/4 cup servings are there in 2/3 of a cup of dip
Reil [10]
I have no clue just hereto get points lol
5 0
3 years ago
What is the ratio for Cos B?
RUDIKE [14]

Answer:

  3/5

Step-by-step explanation:

The cosine ratio is ...

  Cos = Adjacent/Hypotenuse

  cos(B) = BA/BC = 48/80

  cos(B) = 3/5

8 0
3 years ago
the lengths of the sides of a triangle are in the ratio 5:6:7. describe the length of the longest side if the perimeter is less
Alex17521 [72]
Adding the parts in the ratio gives 18 so there are two triangles possible with perimeters less than 54cm where the side lengths are all integers: a 5, 6, 7 triangle or a 10, 12, 14 triangle.

Therefore the length of the longest side must be either 7cm or 14cm (unless you want to include non-integer side lengths, then it could also be 3.5cm, 1.75cm etc)
8 0
3 years ago
A bicycle store costs $2450 per month to operate. The store pays an average of $75 per bike. The average selling price of each b
Murljashka [212]

Answer:

35

Step-by-step explanation:

Breakeven quantity are the number of  units produced and sold at which net income is zero

Breakeven quantity = fixed cost / price – variable cost per unit

Fixed costs are costs that do not vary with output. e,g, rent, mortgage payments

If production is zero or if production is a million, Mortgage payments do not change - it remains the same no matter the level of output.  

Hourly wage costs and payments for production inputs are variable costs

Variable costs are costs that vary with production

fixed cost = $2450

Variable cost = $75

price = $145

(2450) / (145 - 75) = 35

5 0
3 years ago
Other questions:
  • What is 67,000 closer to.
    12·2 answers
  • Find the product 6.43×0.07
    15·1 answer
  • -7x-3=2-7x-5 please solve
    9·2 answers
  • • Machine s is cleaned every 12 weeks. •Machine that is cleaned every 8 weeks. What is the fewest number of weeks that will pass
    9·1 answer
  • Central Park in New York City is rectangular in shape, 4km in length and 0.8 km wide. How far would a run in central be?​
    8·2 answers
  • Grouping x5-3x4+5x-15
    5·1 answer
  • 7: A population of fish initially grows according to the equation P=350(1.09)t12 P = 350 ( 1 . 09 ) , where t is time in years a
    10·1 answer
  • The sum of a number and 5 is squared. The result is 81.
    14·1 answer
  • 0.4x + x2.9 = 1.5<br> what is x
    6·2 answers
  • Which number correctly completes the equation
    13·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!