I believe the Surface Area is 37 inches^2 and the Volume is 15 inches^2
Answer: 3+7+9=19.....7/19=0.368 percent. Move the decimal two places to the right and round up for 37%
Step-by-step explanation:
Add all the colors together to get a TOTAL amount of ALL marbles.
The total amount for this problem is 19 (3+7+9=19)
The blue amount of marbles is given as 7.
Divide the blue amount (7) by the total amount (19) for the specific percentage for that color.
Answer:
The second equation can be written by equation (1) is given below
8x-5y=3
The two equations represents the same line and therefore they have an infinite number of solutions that are true for both equations.
Step-by-step explanation:
Given equation is 
To find the second equation to create the given system of equations to have infinitely many solutions :
The second equation can be written by equation (1) is given below
8x-5y=3
The two equations represents the same line and therefore they have an infinite number of solutions that are true for both equations.
Answer:
Part 1) 
Part 2) 
Part 3) 
Step-by-step explanation:
step 1
Find the value of x
we know that
The sum of the interior angles in any triangle must be equal to 180 degrees
so
In the triangle ABC

substitute the given values

Solve for x


step 2
Find the measure of angle B
we know that

substitute the value of x

step 3
Find the measure of angle C
we know that

substitute the value of x
The time taken for the smaller pipe to fill the pool by itself is 15.71 hours
<h3>Rate of work</h3>
- Time taken for both pipes = 6 hours
- Time taken for long pipe = x
- Time taken for small pipe = x + 6
- Rate of work of both pipes = 1/6
- Rate of work of long pipe = 1/x
- Rate of work of small pipe = 1/x + 6
1/6 = 1/x + 1/(x+6)
1/6 = (x+6)+(x) / (x)(x+6)
1/6 = (x+6+x) / x²+6x
1/6 = (2x+6)(x² + 6x)
1(x² + 6x) = 6(2x+6)
x² + 6x = 12x + 36
x² + 6x - 12x - 36 = 0
x² - 6x - 36 = 0
x = 9.71 or -3.71
The value of x cannot be negative
Therefore, the
Time taken for long pipe = x
= 9.71 hours
Time taken for small pipe = x + 6
= 9.71 + 6
= 15.71 hours
Learn more about rate of work:
brainly.com/question/24900258
#SPJ1