Equation of the line in point slope form is y + 3 = -1/2(x - 7)
Step-by-step explanation:
- Step 1: Given slope of the line is -1/2 and passes through the point (x1, y1) = (7, -3). Equation in point slope form is y - y1 = m(x - x1)
⇒ y - (-3) = -1/2(x - 7)
⇒ y + 3 = -1/2(x - 7)
Answer:
Step-by-step explanation:
Step 1: Identify the GCF of the polynomial.
Step 2: Divide the GCF out of every term of the polynomial. ...
Step 1: Identify the GCF of the polynomial. ...
Step 2: Divide the GCF out of every term of the polynomial.
Step 1: Identify the GCF of the polynomial. ...
Step 2: Divide the GCF out of every term of the polynomial .
You isolate the v and move 3 units down to the left which leads u to 10. Hope this helped
The answer is <span>C. 50%.
The theoretical probability has nothing to do with the experiments. So, we will forget results of the experiment and think about theoretical probability. A coin has two sides - head and tail. The probability to get head is 1/2 = 0.5 = 50%. This is because if you toss the coin and you get head, head is one probability of two probability in total (head and tail). The same situation is with tail. Tail is .</span><span>one probability of two probability in total (head and tail).</span>
Answer:
Train A is faster by a factor of 1.01
Step-by-step explanation:
Given:
Train A:
Distance = 175 Miles
Time = 4 Hours
Train B:
y=43.5x
To Find:
which train travels at a faster rate in by what factor =?
Solution:
The speed of the train A = 
The speed of train A =
The speed of train A = 43.75 miles per hour
Speed of the train B is the slope of the given line
The standard equation of the slope of the line is
y = mx+b
where m is the slope
and we are given with
y = 43.5x
So comparing with the standard equation
m = 43.5
Hence the speed of train B is 43.5 miles per hours
Train A travels faster


rate =1.01