Answer:
Main route:
Smelting --> Rolling --> Converting --> Sheared Sheet
Secondary route -->
Smelting --> Rolling --> rolled sheet
1) Smelting trasnferred materials into Rolling
2) It will be part of that department work in process inventory
"WIP SConverting debit then factorty overhead credit"
Later it will be transferred out as a complete process therefore,
Finished good Inventory - Shared sheet
3) the Smelting department transfer the entire of his output into Rolling department
4) the finished good will become cost of good solg once they are sold.
·
Explanation:
We have to read he description of how the processing system works and check to whichdeparmtent are the goods being transferred or sold.
The correct answer is D. decreasing inventory to lower costs
If you decrease inventory, then you don't have trapped money. If someone needs something, you can then order the things you need from your supplier and then sell it to the people who ordered it.
Answer: Option D: What to inspect? Where to inspect? are the two key questions operated in the inspection process.
Explanation:
For the best output results, the products of all the firms need a check of quality control before the process of the sale. If it is not scrutinized properly, then the entire Manufacture defects can lodge into the hands of Operations Manager. For the best result, The manager needs to decide on what purpose of quality check, the inspection is required and secondly, from which weaker part of the production cycle, did He should inspect by comparing the standard of the quality with the products of other firms.
The two key questions of what and where to inspect are always inspected with the parallel effects in which all the comparisons can be noted and achieve the inference of solution. The inference of solution will chase the defective point of the product and makes them very strong and reduces the problem of cycle flow of work allotted to the Inspection process operation.