The function f(x) is graphed on the coordinate plane.

Mathematics
1 answer:
Marina86 [1]4 years ago
8 0

For this case, what you should do is observe in the graph the value of the function when x = -4.

The value of the function is observed when looking at the vertical axis.

Remember that in a function of the form y = f (x) we have:

x: independent variable

y: dependent variable.

Therefore, for x = -4 we have:

f (-4) = 4

Answer:

The value of the function evaluated at x = -4 is given by:

f (-4) = 4

You might be interested in
Please help i will give brainliest to the most accurate
Korolek [52]

Percent increase from 2000 to 2001 is 12% and from 2001 to 2002 is 12.6%. Thus period of 2001 to 2002 has higher increase percentage.

Solution:

Given that,

Total circulation of local newspaper in 2000 = 3250

Total circulation of local newspaper in 2001 = 3640

Total circulation of local newspaper in 2002 = 4100

As we can see 12% < 12.6%

So period of 2001 to 2002 has higher increase percentage.

6 0
3 years ago
Read 2 more answers
Hope u can read it sorry
Crank
B. 2x5square root of 3
4 0
3 years ago
Read 2 more answers
M5_A3. The expected project completion time for the construction of a pressure vessel is 18 monthsand the project variance is 7.
snow_tiger [21]

Answer:

a) 0.3520

b) 0.9884

c) 0.1292

d) 0.1292

e) 0.7648

Step-by-step explanation:

Problems of normally distributed samples can be solved using the z-score formula.

In a set with mean \mu and standard deviation \sigma, the zscore of a measure X is given by

Z = \frac{X - \mu}{\sigma}

After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X.

In this problem, we have that:

The expected project completion time for the construction of a pressure vessel is 18 months. So \mu = 18.

And the project variance is 7. The standard deviation is the square root of the variance, so \sigma = \sqrt{7}.

a) What is the probability that the project will require at least 19 months?

The pvalue of the zscore of X = 19 is the probability that the project will require less than 19 months. So the probability that the project will require at least 19 months is the subtraction of 1 by this pvalue.

Z = \frac{X - \mu}{\sigma}

Z = \frac{19 - 18}{\sqrt{7}}

Z = 0.38

The pvalue of Z = 0.38 is 0.6480.

So the probability that the project will require at least 19 months is 1 - 0.6480 = 0.3520.

b) What is the probability that the project will be completed within 24 months?

This is the pvalue of the zscore of X = 24.

Z = \frac{X - \mu}{\sigma}

Z = \frac{24 - 18}{\sqrt{7}}

Z = 2.27

The pvalue of Z = 2.27 is .9884. This means that the probability that the project will be completed within 24 months is .9884.

c) What is the probability that the project will require at least 21 months?

Same logic as a). We find the pvalue of the zscore of X = 21, then we subtract 1 by this value.

Z = \frac{X - \mu}{\sigma}

Z = \frac{21 - 18}{\sqrt{7}}

Z = 1.13

The pvalue of Z = 1.13 is 0.8708.

So the probability that the project will require at least 21 months is 1 - 0.8708 = 0.1292.

d) What is the probability that the project will be completed within 15 months?

Same logic as b). This is the pvalue of the zscore of X = 15.

Z = \frac{X - \mu}{\sigma}

Z = \frac{15 - 18}{\sqrt{7}}

Z = -1.13

The pvalue of Z = -1.13 is .1292. This means that the probability that the project will be completed within 15 months is .1292.

e) What is the probability that the project will take between 16 and 24 months to complete?

This is the pvalue of Z = 24 subtract by the pvalue of Z = 16.

In b), we found that the pvalue of Z = 24 is .9884

Now we find the pvalue of Z = 16

Z = \frac{X - \mu}{\sigma}

Z = \frac{16 - 18}{\sqrt{7}}

Z = -0.76

The pvalue of Z = -0.76 is 0.2236

So the probability that the project will take between 16 and 24 months to complete is 0.9884 - 0.2236 = 0.7648

8 0
4 years ago
ANSWER THESE 3 PROBLEMS IN FRACTIONS AND DECIMAL!!! WILL GIVE 50 POINTS AND BRAINLIEST!!
BabaBlast [244]

Answer:

1. .........................................

  • 2x = 3
  • x = 3/2  Fraction
  • x = 1.5  Decimal

2. ..........................................

  • 5y = 3
  • y = 3/5  Fraction
  • y = 0.6  Decimal

3. ..........................................

  • 0.3z = 0.009
  • z = 0.009/0.3 = 9/300 = 3/100  Fraction
  • z = 0.09  Decimal
5 0
3 years ago
N+12=4 what is the process of the equation
Sunny_sXe [5.5K]

Hey there!

Here is your question -

n+12=4

In this equation, you're looking for n alone. To keep the variable alone, you have to do the opposite of what's happening to the variable.

In this equation, 12 is being added to n. The opposite of that is subtracting 12.

Subtract 12 from both sides -

n+12-12=4-12 \\ n=-8

Your answer is -8.

Hope this helps! :)

6 0
3 years ago
Read 2 more answers
Other questions:
  • The number has 9 digits. the digit in the tenths place is the digit used to represent a half dozen. the digit in the tens place
    12·1 answer
  • Help with this math please ​
    10·1 answer
  • write an equation in slope-intercept form for the line that is perpendicular to -2x-8y=16 and that passes through (4,5)
    13·1 answer
  • $2,758 divided by $63
    12·2 answers
  • What is the difference of 904.6 and 78.94
    12·1 answer
  • The answer is 7/5<br> Please help:)
    9·2 answers
  • What weight remains when 5/9 of a cake weighing 450 grams is eaten.​
    12·2 answers
  • There are 6 2/3 pounds of walnuts in a container, which will be divided equally into containers that hold 1 1/2pounds. This woul
    5·1 answer
  • Christine's parents gave her $70 to spend at the Topsfield Fair. She spent $10 on flowers and needs to buy vases. Each antique f
    8·1 answer
  • I will give you brainlyest and give you points​
    15·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!