Answer:
The number of pies does the baker have left is 15.
Step-by-step explanation:
Given : A baker made 20 pies. A Boy Scout troop buys one–fourth of his pies, a preschool teacher buys one–third of his pies, and a caterer buys one–sixth of his pies.
To find : How many pies does the baker have left?
Solution :
Let x be the number of pies does the baker have left.
According to question,
Number of pies buys,
One-fourth =
One-third =
One-sixth =
i.e. 






The number of pies does the baker have left is 15.
Answer:
The train need to leave Portland at 03:27 am
Step-by-step explanation:
step 1
Find out how long it takes the train to travel from Portland, Oregon, to Los Angeles, California
Remember that
The speed is equal to divide the distance by the time
so
The time is equal to divide the distance by the speed
Let
s ---> the speed in miles per hour
d ---> the distance in miles
t ---> the time in hours

we have


substitute

step 2
Adds 30 minutes (time it takes to get from the train station to her aunt's house)
Remember that


Convert to minutes

step 3
Remember that

Convert to minutes

Subtract 993 minutes from 1,200 minutes

Convert to hours+minutes


so


therefore
The train need to leave Portland at 03:27 am
Finding perimeter is simple. All you do is add up all of the side lengths, and bada bing bada boom, you got the perimeter.
Answer:
7 markers cost $8.95
Step-by-step explanation:
9x = 11.50
x = 11.5/9 = 1.278
Therefore, 7 markers, or 7x = 7(1.278) = 8.946
Answer:
The data item is 
Step-by-step explanation:
Normal Probability Distribution:
Problems of normal distributions can be solved using the z-score formula.
In a set with mean
and standard deviation
, the z-score of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.
Mean of 400 and a standard deviation of 60.
This means that 
z=3
We have to find X when Z = 3. So




The data item is 