Answer:C (-2, 1)
Step-by-step explanation:
Answer:
So to maximize profit 24 downhill and 20 cross country shouldbe produced
Step-by-step explanation:
Let X be the number of downhill skis and Y the number of cross country skis.
Time required for manufacturing and finishing each ski are: manufacturing time per ski, downhill 2.5 hours, cross country 1.5 hours
Finishing time per ski: downhill 0.5 hours, cross country 1.5 hours.
Total manufacturing time taken = (2.5) x+ (1.5+) y = 2.5x+1.5y≤90
total finishing time taken = 0.5x+1.5 y≤42
Profit function
Z = 50x+50y
Objective is to maximize Z
Solving the two equations we get intersecting point is
(x,y) = (24,20)
In the feasible region corner points are (0.28) (36,0)
Profit for these points are
i) 2200 for (24,20)
ii) 1400 for (0,28)
iii) 1800 for (36,0)
So to maximize profit 24 downhill and 20 cross country shouldbe produced.
Answer:
9a-65
Step-by-step explanation:
simply write 9a+(add the remaining numbers all together)
Answer:
125
Step-by-step explanation:
The total number of marbles is 6+10 = 16
P (black) = black / total
= 10/16 = 5/8
With 200 draws, take the probability of P(black) times 200 since the marble is returned each time
200 * (5/8) = 125
We would expect to get 125 black marbles