Answer:
12.00%
Explanation:
As per the given question the solution of standard deviation of a portfolio is provided below:-
Standard deviation of a portfolio = √(Standard deviation of Product 1)^2 × (Weight 1)^2 + Standard deviation of Product 2)^2 × (Weight 2)^2 + 2 × Standard deviation of product 1 × Standard deviation of product 2 × Weight 1 × Weight 2 × Correlation
= √(0.165^2 × 0.6^2) + (0.068^2 × 0.4^2) + (2 × 0.6 × 0.4 × 0.165 × 0.068 × 0.7)
= √0.009801 + 0.0007398 + 0.00376992
= √0.01431076
= 0.119628592
or
= 12.00%
So, we have calculated the standard deviation of a portfolio by using the above formula.
Answer:
54.48%
Explanation:
The computation of the weight of equity is given below;
But before that we need to do the following calculations
Total Equity
= 3 million shares × $30
= $90 million
The Value of Debt,
Total Debt = 80,000 (1,000)(0.94)
= $75.2 million
Now the weight of equity is
= $90 million ÷ ($90 million + $75.2 million)
= 54.48%
Answer:
It is Control the inventory process (B)
Explanation:
Control the inventory process : Unusual shortage of products on Walmart shelves is an evidence of poor inventory control system.
The deficiencies in the system must be identified and then appropriate corrective control system to address them must be put in place.
A system that prevent stock-out on the shelves must be adopted and its compliance must be enforced.
Answer:
Project L is the better project as it has higher NPV and its IRR is 12.70%
Explanation:
- NPV of Project S as followed:
-1,000 + 895.03/(1+10.5%) + 250/(1+10.5%)^2 + 10/(1+10.5%)^3 + 5/(1+10.5%)^4 = $25.5
- NPV of Project L as followed:
-1,000 + 5/(1+10.5%) + 260/(1+10.5%)^2 + 420/(1+10.5%)^3 + 802.5/(1+10.5%)^4 = $67.
<u>=> Project L is the better Project as it has higher NPV.</u>
The IRR is the discount rate that puts the net present value of project's cash flows to 0 (zero).
- IRR of Project L as followed:
-1,000 + 5/(1+IRR) + 260/(1+IRR)^2 + 420/(1+IRR)^3 + 802.5/(1+IRR)^4 = 0 <=> IRR = 12.70%
Yes it would soo the answer s true