1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
harkovskaia [24]
4 years ago
15

About how much air would fill a ball with a radius of 16cm

Mathematics
2 answers:
Tems11 [23]4 years ago
5 0
100.531 I s the answer I think
podryga [215]4 years ago
3 0
100.531cm is the answer 
You might be interested in
Give the equation of the line, perpendicular to the line with equation y=2x+1, that passes
katrin [286]

Answer:

y=-1/2x+2

Explanation:

8 0
3 years ago
Which of the following relation graphs represents a function?<br> A.
Makovka662 [10]

Answer:

The third one (parabola)

Step-by-step explanation:

Do a vertical line test.

Basically draw vertical lines over the function. If the x-value has more than one y-value then it is a relation and not a function

5 0
3 years ago
What is the value of x?
Nikolay [14]
50/x = 42 / 63
x = 50 * 63 / 42
x = 75
7 0
4 years ago
How do you interpret the statement that F(60)=86?
igor_vitrenko [27]

Answer:

Step-by-step explanation:

"F" is the name of a function.  If we choose "60" as the input to this function, the resulting output vaue is 86.  The function F maps 60 (input) onto 86 (output).

5 0
3 years ago
Read 2 more answers
A worker on a scaffolding 75 ft above the ground needs to lift a 500 lb bucket of cement from the ground to a point 30 ft above
Lemur [1.5K]

Answer:

W = 15900 ft.lb

Step-by-step explanation:

From the given information.

Consider y to be the distance from the ground towards the bucket of the cement.

At height y, suppose the bucket is lifted by Δy.

Then, the workdone can be = 500Δy + 0.5(75 - y) Δy

where;

The bucket of the cement =  500Δy

The remaining of the rope =  0.5(75 - y) Δy

However; the workdone (W) can be calculated as:

W = \int^{30}_{0} \ 500 \ dy + \int^{30}_{0} \ 0.5 (75-y ) \ dy

W = 500 \times 30 + 0.5 \bigg(75 \times 30 - \dfrac{1}{2} \times 30^2 \bigg )

W = 15000 + 0.5 ( 2250 - 450)

W = 15000 + 900

W = 15900 ft.lb

6 0
3 years ago
Other questions:
  • A chain fits tightly around two gears as shown. What is the radius of the smaller gear? Round your answer to the nearest tenth.
    5·2 answers
  • How do i find the area between the two curves
    15·1 answer
  • there is 20 pounds of dough for pizza. The recipe says it requires 15 1/2. how much will be left over?
    5·2 answers
  • Is the square root of 1/9 rational or irrational
    14·2 answers
  • How old am I if 500 reduced by 2 Times my age is 250​
    6·1 answer
  • Find BR given GB = 3x – 5, BR = 6x – 15, and GR = 70
    12·1 answer
  • We’re doing similarity and I’m really confused
    12·2 answers
  • On​ Tuesday, it snowed 15 inches in 6 hours. On​ Friday, it snowed 30 inches in 8 hours. On which day did it snow at a greater r
    12·1 answer
  • 1. A. What is the mean absolute deviation of the following data set? Round to the nearest hundredth if necessary.
    8·1 answer
  • Statement: "Three less than four times a number is greater<br> than or equal to 41."
    12·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!