Answer:
True
Step-by-step explanation:
The variable overhead rate variance refers to the difference in two variables.
The Variables are
1. The actual variable manufacturing overhead
2. The expected variable overhead given the number of hours worked
Labor rate variance is evaluated by
AH(AR - SR)
AH = actual hours
AR = actual rate
SR = standard rate.
The variable overhead rate variance is also calculated the same way except that it replaces the direct labor rates with variable overhead rates
Answer:
140,000
Step-by-step explanation:
Take 400,000 * 0.35 = 140,000.
When given a percentage, take the number and divide by 100.
In this case 35 / 100 = 0.35.
Then you can take the total amount and multiply it by the percentage in decimal form.
In this case 400,000 * 0.35
Answer:
250:2
Step-by-step explanation:
Hope it helps!
Answer:
2.3 feet/ second
Step-by-step explanation:
To find the rate of change, we will have to find the difference in his distance travelled and divide it by the time taken to move that distance.
This is given by rate of change = (change in position)/ change in time
From the question, his position changed from 30 ft to 100 ft thus the distance he travelled is = 100ft - 30 ft = 70 ft.
Time taken to travel this distance = 40 seconds - 10 seconds = 30 seconds
Diver's rate of travel = 70 ft / 30 seconds = 2.33333ft/second.
Rounding off the answer to the nearest tenth, we have 2.3 ft/second
Value of x=34degree will make parallelogram ABCD a rhombus