If the train travels 18 mph you just have to divide 270 by 18 and that would be your answer.
So 270/18 = 15 which means it would take the train 15 hours to travel 270 miles.
answere=-1
this is the answere and the explanation.
Y=mx+b is equation form.
Step 1: Calculate slope
Slope= y2-y1/x2-x1
Choose 2 points (8,7) and (0,1)
Apply slope formula: 1-7/0-8=-6/-8=3/4(simplified)
M=Slope
Y=3/4x+B
B=Y intercept: 1
Equation: Y=3/4x+1
(I can give a more thorough explanation if you have any questions).
The answer is 6. To answer this you would need to do 16.5/11 to get 1.5 (that's how much the rectangle got enlarged). Then you would do 4 times 1.5 to get your new height size, which is 6.