Answer:

Step-by-step explanation:
Given : 8%
To find the decimal value of the percentage number
Remove the percentage symbol with 100 in the denominator
gives

Now taking the numerator to the decimal place equal to the number of zeros in the denominator or simply divide denominator with numerator.
Gives = 
So, the decimal equivalent of the given value is 
Answer:
slope = - 
Step-by-step explanation:
Calculate the slope m using the slope formula
m = 
with (x₁, y₁ ) = (2, 0) and (x₂, y₂ ) = (32, - 5)
m =
=
= - 
Answer:
38
Step-by-step explanation:
Let SUV be a triangle
Perimeter of SUV = SU+SV + UV
102 = 38 + 26 + UV
102 = 64 + UV
UV = 102 - 64
UV = 38
Hence the length of UV is 38
Answer:
So if he needs 1.5 of the lemonade mix, to find how much you need, simplu divide.
Step-by-step explanation:
4.5/1.5=3
He can make 3.
Answer:
828.7 hours.
Step-by-step explanation:
To answer a question in which the total time has to be calculated of all the activities, first of all, all the times have to be converted to a single form. There are two types: decimals and fractions. Convert the fractions into decimals.
Department A = 202.50 hours.
Department B = 212 3⁄4 hours = 212.75 hours.
Department C = 198.25 hours.
Department D = 215 1⁄5 hours = 215.20 hours.
Therefore, the total number of hours spent on this project by all four departments. is the sum of all the above numbers. 202.50 hours + 212.75 hours + 198.25 hours + 215.20 hours = 828.7 hours.
Therefore, the total time is 828.7 hours!!!