Answer:
Minimum cycle time = time for longest task = 2.4 minutes
Maximum cycle time = sum of the times to complete all the tasks = 18 minutes
Step-by-step explanation:
For the minimum cycle time, the reasoning is that all the tasks can be done simultaneously, at some during the assembling task. Hence, minimum time to complete one cycle is the time it takes to complete task that takes the longest time to complete.
For the maximum cycle time, the reasoning here is that each task is done after the completion of the previous task. The total time taken to finish the task will then be the sum of the time taken to complete each task. This usually is at the beginning of operations.
Answer:
none of the two graphs in the pic.
it should be one in the II quadrant
Step-by-step explanation:
the plus four means to move 4 to the left
the plus 2 means to move up 2
That would make the vertex in the II quadrant.
Step-by-step explanation:

Answer: at least 1
Step-by-step explanation: