The probability is 1/2 or 50%.
Hope this helps :)
First, you need to find the average rate of change (the number of bolts produced per minute). To do this you divide 440 by 48, which equals approximately 9.16; therefore, the machine produces approximately 9.16 bolts per minute. To find out how many bolts would be produced in 30 minutes, multiply 9.16 by 30, which is 274.8. Round this number and you get 275 as your final answer. I hope I helped :)
Answer:
C. 60
Step-by-step explanation:
9 is 3 times 3, so you have to multiply 20 by 3 as well
Answer:
can't see the question
Step-by-step explanation:
Percent error=|
| times 100
(note the || is absolute value, means that whatever the result is inside, it is made positive)
predicted value=261
actual value=293
subsitute
percent error=|
| times 100
so using pemdas
do parenthasees first
|
|
|-0.12|
absolute value
0.1226
time 100
0.1226 times 100=12.26
answer is 12.26%
answer is B