In costing analysis, direct materials, labour and direct expenses aggregate to prime cost. Alternately, the aggregate of indirect materials, labour and expenses is termed as overhead. Overheads are classified into fixed and variable.
Variable overhead is one which varies directly as per number of units produced
Variable overhead rate variance = actual costs -(AHxSR)
= Actual costs - (Actual hours x std rate)
= Actual hours x actual rate - actual hours x std rate
Hence option D is right.
Answer:

Step-by-step explanation:
Y in math is usually referred as the output.
X is usually the input.
In other words,
<em>y</em><em> </em><em>is</em><em> </em><em>3</em><em> </em><em>more</em><em> </em><em>greater</em><em> </em><em>than</em><em> </em><em>x</em><em>.</em>
<em>In</em><em> </em><em>other</em><em> </em><em>words</em><em>,</em>
<em>
</em>
Answer:
21 and 30
Step-by-step explanation:
x + y = 51
x - y = 9
add the two equations and y's will cancel out
2x = 42 divide by 2
x = 21 so put 21 in for x in the top equation and solve
21 + y = 51
y = 30
Answer:
its most likely CORRECT!
just have confidence that your answers are correct :)
First, r<span>earrange the equation by subtracting what is to the right of the equal sign from both sides of the equation : </span><span>3*(2*x-1)-(4*x+2)=0
= </span><span>3 * (2x - 1) - (4x + 2) = 0
= 2x - 5 = 0
= </span>2x-5 = 0<span> ---- </span><span>Add </span> 5 to both sides of the equation ---><span>
</span>= 2x = 5
Then you will divide both sides of the equation by 2 and get,
<span>= x = 5/2 OR 2.5
I hope this helps!</span>