Step-by-step explanation:
If x is the mass of 30% copper alloy, and y is the mass of 65% copper alloy, then:
x + y = 80
0.30x + 0.65y = 0.51(80)
Solving the system of equations using substitution:
0.30x + 0.65(80 − x) = 0.51(80)
0.30x + 52 − 0.65x = 40.8
11.2 = 0.35x
x = 32
y = 80 − x
y = 48
The metalworker needs 32 kg of 30% copper alloy and 48 kg of 65% copper alloy.
Answer:
It takes 70 minutes for 9 team members (painting 60 sq ft per minute) to paint a 4200 sq ft wall.
Step-by-step explanation:
4800 ÷ 20 = 240 sq ft per team member in 36 minutes
240 ÷ 36 = 6.67 sq ft per team member in 1 minute
6.67 × 9 = 60 sq ft per 9 team members in 1 minute
4200 ÷ 60 = 70 minutes (or 1 hour and 10 minutes)
Answer:
SSS, UVD, the answer is D
Step-by-step explanation:
90/9 = 10
70/7 = 10
80/8 = 10
triangle LMN congruent triangle UVD
The answer to 2y+7(y-3)=60 is y=9
Answer:
7
Step-by-step explanation:
and beetween 10-3 7 pizza