-1/2(-5/6+1/3), do PMDAS. (-5/6) = -0.833 (repeated) and (1/3) = 0.333 (repeated) and you add them both (-0.833 + 0.333) = -0.5 and -1/2 = -0.5 and when you multiply them both it would equal 0.25. or another explanation for the answer is 5/12 = 0.41666666666 and 1/6 = 0.16666666666 and when you subtract them both you get 0.25, I hope this was helpful.
Answer: 8 minimum work stations is what would be needed.
Step-by-step explanation:
The cycle time is computed as the operating time daily divided by the scheduled output.
It is important to note that the daily capacity of the operation layout is the operating time divided by the cycle time.
Therefore,
If you need to produce 30units/hour.
The average cycle time is as follow:
The average cycle time is the average time between the completions of units.
60/30= 2 average cycle time
=16/2
=8
8 work stations is the minimum number that would be needed.
It is important to know that in an assembly line balancing, the minimum number of work station is the ratio of the sum of all tasks time to the cycle time.
The external tangent is line s
Answer:
Your answer would be the first option.
A right angle is 90 degrees
An obtuse angle is more than 90 degrees and that angle is more that 90 degrees
35x plus 12
you cannot add them since they are not like terms