Answer:
c. x21 + x22 + x23 less or equal than 2800 y2
Step-by-step explanation:
The plant has a maximum capacity of 2800 then the sum of all these operations must be equal to or less than 2800. The site of the plant has capacity constraint which needs to be determine through equation. The total capacity for the plant 2 is only 2800 the operation has to be distributed with keeping in mind the capacity limit.
Answer:
The standard deviation (σ) = 0.05
Step-by-step explanation:
The question is to find the standard deviation.
STEEP 1: FIND THE MEAN
(10+9.9) ÷ 2 = 9.95
STEP 2: SQUARE THE DIFFERENCE BETWEEN SPRINT TIME AND MEAN
10-9.95= 0.05
0.05^2 = 0.0025
9.9 - 9.95= -0.0025
-0.0025^2 = 0.0025
STEP 3: FIND THE VARIANCE
0.0025+0.0025= 0.005
0.005/2= 0.0025
STEP 4: FIND THE STANDARD DEVIATION (σ )
√variance
√0.0025 = 0.05
Therefore
σ = 0.05.
From the standard deviation, the percentage probability of the higher value to occurs is
0.05×100= 5%
That means Doug has 95%
And Bob has 5%
Answer:
Median=3, Mean=2.333
Step-by-step explanation:
Put the ratios into fraction form. Since you do not know how many problems, replace it with an unknown number a.k.a. a variable.
10/30 = x/60
Since you can get 30 to 60 by multiplying by 2, multiply everything on the left side by 2.
Then, you get 20/60, which means 20 = x. So, he can complete 20 minutes an hour.