Answer:
3 inches per hour
Step-by-step explanation:
divide the number on the y axis (i'm assuming it's inches of snow) by the number on the x axis (i'm assuming its hours)
by doing this you will get 3 inches per hour
Answer: In my answer I got 9 because the formula to find the area it would be A=1/2b*h
Step-by-step explanation: How would you do this?
Well we know that the base equals 6 we have heighth so we would have to do 1.5*6 and that would give us 9 but if we round it would be 10 because 9 is closer to 10 than it is to 0.
thanks :)
Answer:
It will be biased.
Step-by-step explanation:
By surveying only grades 1, 2, and 3, she is not taking a representation of the entire school. It is possible that the popular color or the color the students like would change over time and the opinion of the younger kids could be different from that of the older kids. Therefore, the sample is biased unless she surveys students from all grades.
Answer:
300
Step-by-step explanation:
X^2=10×10=100
3×100=300
Answer:
P ( snowboard I ski) = 0.5714
Step-by-step explanation:
Conditional Probability
We use the conditional probability formula to solve this question. It is

In which
P(B|A) is the probability of event B happening, given that A happened.
is the probability of both A and B happening.
P(A) is the probability of A happening.
In this question:
Event A: Ski
Event B: Snowboard.
28 out of 120 students ski:
This means that 
16 out of 120 do both:
This means that 
P ( snowboard I ski)

So
P ( snowboard I ski) = 0.5714