B. y=4/5x its just taking half
Answer:
If ‘A’ can finish a work in ‘n’ days then part of work finished in 1 day
will be
.
Step-by-step explanation:
From the question, it is clear that
- If ‘A’ can finish a work in ‘n’ days, then
- we have to determine the part of work finished in 1 day.
So
let '
' be the number of days
takes to complete the whole work
Let the whole job be denoted as '
'
Thus, the part of work finished in 1 day will be:

Therefore, If ‘A’ can finish a work in ‘n’ days then part of work finished in 1 day will be
.
Keywords: work, word problem
Learn more about word problem form brainly.com/question/12419898
#learnwithBrainly
chapati Duniya Lagti Hai Duniya
Answer:
The midpoint is (10, 4)
Step-by-step explanation:
To find the midpoint, you add the x value from the first coordinate and the x value from the second coordinate, then divide by two to get the x coordinate of the midpoint. You do the the same exact thing with the two y values to find the y coordinate of the midpoint.
2 + 18 = 20
20 / 2 = 10
1 + 7 = 8
8 / 2 = 4
(10, 4)
Hope this helps!
Answer:
The width of member is as follows:
b = 3 ft
b = 3 × 12 in.
b= 36 in.
The depth of member is as follows:
d = 8 ft
d = 8 × 12 in.
d=96 in.
Since the structure used is Douglas fir-Larch lumber of size 3 × 8 size. Hence, tensile strength, f =1000 psi
Calculate the net area of the member as follows:
A = (b - ∅) × d
A= (36 - 7/8) × 96

Calculate the maximum axial tensile load by ASD method as follows:
P = f × A
P = 1000 x 3372
P = 3372000 lbs
P = 3372 kips