Ok so pete lays 10 more than jim per hour
pete and jim laid same amount of tiles
j=jim's rate
p=pete's rate
6j=5p
but pete lays 10 tile per hour faster so
p=10+j
sub
6j=5(10+j)
6j=50+5j
minus 5j both sides
j=50
jim can lay at 50 tiles per hour
Where are the graphs?
the graph that will represent the points, is the one with the points on it 8 for x value and 6 for y value
First, 9.8 (Gravity) times 3 (time) equals 29.4, which is the velocity after 3 seconds. The kinematic equation for change in position that uses the variables we have is:
delta x= (v)(t) -0.5(acceleration)(time)^2
delta x= 29.4 times (3) - 0.5 (9.8) times 9
delta x= 44.1
100 minus 44.1 equals 55.9, which is the answer for part a.
Tell me if you need any clarification
PART B:
The kinematic equation for this is:
delta x= (initial velocity) times time plus 0.5 (a)(time)^2
100=(0)times(x) plus 0.5 (a)(time)^2
100=0.5(9.8)(x)^2
100=4.9x^2
100/4.9 is approxamitely 20.4.
The squareroot of this is approxamitely 4.5.
4.5 seconds
Tell me if you need any clarification
Answer:
<em>least</em><em> </em><em>to</em><em> </em><em>greatest</em>
<em>.</em><em>86</em><em>,</em><em> </em><em>8</em><em>/</em><em>9</em><em>,</em><em> </em><em>.</em><em>9</em>
Answer:
A
Step-by-step explanation:
you can just plug in the numbers until they come out equal