Answer:
The value of the firm or worth of the firm is $147058.82 rounded off to 2 decimal places
Explanation:
We first need to calculate the required rate of return for this firm that will be used as the discount rate in the valuation of the firm using the discounted cash flow methods.
Using the CAPM we can calculate the required rate of return as,
r = rRF + Beta * (rM - rRF)
Where,
- rRF is the risk free rate
- rM is the return on Market
So,
r = 0.04 + 0.4 * (0.11 - 0.04)
r = 0.068 or 6.8%
As the cash flows the firm can generate are expected to remain constant through out and they are generated after equal interval of time, this can be treated as a perpetuity.
The present value of a perpetuity is calculated as follows,
Present Value of perpetuity = Cash Flow / r
Present value of perpetuity = 10000 / 0.068
Present value of perpetuity = $147058.8235
So, the value of the firm or worth of the firm is $147058.82 rounded off to 2 decimal places
The answer is <span>the last digit is "estimated".
</span>
The Scientific notation or configuration shows a number in exponential notation, by replacing some portion of the number with E+n, where E (which remains for Exponent) duplicates the first number by 10 to the nth power. For instance, a 2-decimal Scientific notation shows 12345678901 as 1.23E+10, which is 1.23 times 10 to the tenth power. Hope this helps!
This statement is false.
Conversion and direct materials are generally both not added at the end of the production process. As a matter of fact, they are either added at the beginning, or in the middle of the process, but definitely not at the end because then it would be too late.
Education and training provides employers, managers, supervisors, and workers with: Knowledge and skills needed to do their work safely and avoid creating hazards that could place themselves or others at risk. Awareness and understanding of workplace hazards and how to identify, report, and control them.
Answer:
A U.S.-based MNC has just established a subsidiary in Algeria. Shortly after the plant was built, the MNC determines that its exchange rate forecasts, which had previously indicated a slight appreciation in the Algerian dinar, were probably false. Instead of a slight appreciation, the MNC now expects that the dinar will depreciate substantially due to political turmoil in Algeria. This new development would likely cause the MNC to reduce its estimate of the previously computed net present value.
Explanation:
The difference between the present value of cash inflows and the present value of cash outflows over a period is referred to as the net present value (NPV).
NPV is used In capital budgeting and investment planning, NPV is used to analyze the profitability of a projected investment or project.
The company should therefore reduce the estimates because it will increase the discount rate which would, in turn, impact the net present value (NPV) and drag it down to lower value.