mafiozo [28]
4 years ago
6

I will rate you the brainliest ‼️

Mathematics
1 answer:
Juliette [100K]4 years ago
4 0
The answer is B.
Best of luck.
You might be interested in
Select all the equations that can be represented by a straight line when graphed ton on the coordinate plane.
Ainat [17]

Answer:

add all of it

Step-by-step explanation:

5 0
3 years ago
the points j(-8,9) and k(-2,-5) are endpoints of a diameter of circle C. What equation would represent circle C
Harman [31]

Answer:

(x+5)² + (y-2)² =58

Step-by-step explanation:

"Your answer needs to be at least 20 characters long"

8 0
3 years ago
A donut has a diameter of 7 in. What is the radius?
lisabon 2012 [21]

Answer:

The radius is 3.5 inches I think.

Step-by-step explanation:

Hope this helped Mark BRAINLIEST!!!

5 0
3 years ago
Read 2 more answers
Angel borrowed $141 to buy a stereo. He pays backs $14 each week. How much does he still owes after each week? Use a graph if yo
Harrizon [31]

Logically, he would owe 14 less each week

Let x = # of weeks passed

Algebraic Expression: 141 - 14x =

Week 1: 141 - 14 = 127

Week 2: 141 - 14(2) = 113

Week 3: 141 - 14(3) = 99

etc.....

Hope this helps


3 0
3 years ago
The Best Company produces two commercial products : blenders and mixers. Both products require a two step production process inv
deff fn [24]

Answer:

Maximum profit is $87 when 3 blenders and 11 mixers are produced.

Step-by-step explanation:

let blender is represented by x_{1} and and mixer by x_{2}.

total time to deliver parts = 24 hrs

total time to assemble = 30 hrs

time taken by each blender to deliver parts = 1 hr

time taken by each mixer to deliver parts = 2 hr

time taken by blenders in final assembling= 2 hr

time taken by mixers in final assembling = 3 hr

Each blender produced nets the firm=  $7

Each mixer produced nets the firm=  $6

Using this all data linear system of equation will be:

x_{1} + 2x_{2} =24  ----- (1)\\2x_{1} + 2x_{2} = 30 ----- (2)\\

profit function:

z= 7x_{1} +6x_{2} --- (3)

from (1)\\x_{1} = 0 \implies x_{2}= 12\\x_{2}= 0 \implies x_{1}= 24\\

Coordinate points obtained from (1) are (0,12) and (24,0)

from (2)\\x_{1}=0 \implies x_{2}=10\\x_{2}=0 \implies x_{1}=15\\

Coordinate points obtained from (2) are (0,10) and (15,0)

plotting these on graph

points lying in feasible region are:

A(0,0)

B(0,10)

C(3,11)

D(12,0)

substituting these points in (3) to find the maximum profit:

for A (0,0)

z = 0

for B (0,10)

z = 60

for C (3,11)

z =  87

for D (12,0)

z=84

So maximum profit is $87 when 3 blenders and 11 mixers are produced.

4 0
4 years ago
Other questions:
  • Express in exponential form.<br><br> log(base 2) 16=4
    7·1 answer
  • A clydesdale drinks about 120 gallons of water every 4 days at this rate about how many gallons of water does clydesdale drink i
    5·1 answer
  • Factor the expression <br><br> d^2+12d+36
    12·2 answers
  • Please please please help me with my problem! Thank you :)
    7·1 answer
  • 15 FIFTEEN POINTS AND BRAINLIEST!!
    6·2 answers
  • Given ADEF, find DE.<br> Round your answer to the nearest hundredth.<br> 55<br> Check
    11·1 answer
  • 1+1 explain in ironically amazing detail!​
    13·2 answers
  • Can anyone help? I struggle with Algebra
    11·1 answer
  • Graph the linear equation using slope-intercept form. Y=-5/3x+4
    10·1 answer
  • What is the rate of change of the function y = 2x-3y=2x−3?
    10·1 answer