Answer:
The length of the sloping section of the ramp is 20.12 m
Step-by-step explanation:
Given;
the total height of the bank, h = 2.8 m
The slope of the ramp must be 8° to the horizontal, i.e, θ = 8°
Let the length of the sloping section = L
let the horizontal distance between the height of the bank and sloping section = b
Thus, h, L and b forms three sides of a right angled-triangle, with L as the hypotenuse side, h (height of the triangle) as the opposite side and b (base of the triangle) as the adjacent side.
We determine L by applying the following formula;
Sinθ = opposite / hypotenuse
Sin θ = h / L
L = h / Sin θ
L = 2.8 / Sin 8
L = 2.8 / 0.13917
L = 20.12 m
Therefore, the length of the sloping section of the ramp is 20.12 m
Answer:
160m squared
Step-by-step explanation:
Answer:
200 and 546
Step-by-step explanation:
dejar a = Primer periodo (first term)
dejar d = Diferencia común (common difference)
dejar 100th término = T100
dejar 273 término = T 273
utilizando
Tn = a + (n - 1)d
T100 = 2 + (100 - 1) 2
= 2 + 99 ×2
= 2 + 198
= 200
T273 = 2 + (273 - 1) 2
= 2 + 272 × 2
= 2 + 544
= 546
7.) the equation of the circle is
(x - 3)^2 + (y - 4)^2 = 25
If you substitute the point in you get
(6-3)^2 + (8-4)^2 = 25
3^2 + 4^2 = 25
9 + 16 = 25
25 = 25
Both sides of the equation are the same so it proves it lies on the circle
8.) you add the x coordinates together and divide by 2
7 + 4 = 11
11/2 = 5.5
You use +7 because you need to find the midpoint.
You then add 5.5 to - 7 or - 5.5 from 4
-7 + 5.5 = - 1.5
You do the same for y coordinates
6+5 = 11
11/2 = 5.5
6-5.5 = 0.5
So the coordinates of Rachel's house are
(-1.5, 0.5)
Answer:
The answer is letter A.
Step-by-step explanation:
The amount that each company charges per hour on the pool is known, however the amount of hours they will be working is not, and is needed to distinguish which company is cheaper. Therefore, the number of hours is substitued by x and it is right next to the amount they charge for each hour. To find what each company charges, you must sum up what they charge and what they charge per hour, times the hours they will have to work on it( which is unknown and by x).