Earnings=20% of sales+7.5h+40
coeficinets are 7.5 and 0.2
vraiables are h and s
constant is 40
B. if h=25 and s=30 input,
7.5*25+0.2*300+40=$287.50
C
new equation is 9h+0.2s+40
coefienct woud be 9 and 0.2
variable is h and s
constant is 4
Answer:
128
Step-by-step explanation:
To produce at a point lying inside the production possibilities curve would require economic growth.
<h3>What is
production possibilities curve ?</h3>
The production possibilities curve can be described as a graph that help to display the different combinations of output which can be gotten from given current resources and technology.
In this case, To produce at a point lying inside the production possibilities curve would require economic growth.
Learn more about production possibilities curve on:
brainly.com/question/26460726
#SPJ4
The value of the functions f(x) and g(x) will be √(4x + 3) and √2. Then the correct option is B.
<h3>What is a function?</h3>
A statement, principle, or policy that creates the link between two variables is known as a function. Functions are found all across mathematics and are required for the creation of complex relationships.
If (f g)(x) = h(x) such that h(x) = √(8x + 6). Then we have
(f g)(x) = h(x)
f(x) · g(x) = h(x)
Then put the value of h(x), then we have
f(x) · g(x) = √(8x + 6)
f(x) · g(x) = √2(4x + 3)
f(x) · g(x) = √(4x + 3) × √2
Thus, the value of the functions f(x) and g(x) will be √(4x + 3) and √2.
Then the correct option is B.
More about the function link is given below.
brainly.com/question/5245372
#SPJ1
Answer:
C = (A*P - 8.4Y -330T + 200I) / 100
Step-by-step explanation:
P = (8.4Y + 330T + 100C -200I ) / A
now we have to calculate completed passes C for given P, Y, T, I, A
A*P = 8.4Y + 330T -200I +100C
100C = A*P - 8.4Y - 330T + 200I
C = (A*P - 8.4Y -330T + 200I) / 100
I just solved the equation for C