Answer:
Option a.
I and III
Step-by-step explanation:
Observing the graph
For n=400 coats
The cost is about $2,200
and
The revenue is less than $1,400
Substitute the value of n=400 in each equation to find the solution
I Cost 1.5(400)+1,600=$2,200 ----> is ok
II Cost 4.5(400)+1,600=$3,400 ----> is not ok ( is greater than $2,200)
III Revenue 3.25(400)=$1,300 ----> is ok ( is less than $1,400)
IV Revenue 5.75(400)=$2,300 ----> is not ok ( is greater than $1,400)
therefore
The solution is I and III
Answer:
find the area if the sector,then the area of the triangle.After that, Subtract the area of the triangle from the area of the sector
Answer:
v = 0.416 m/s
Step-by-step explanation:
Give that,
Distance covered by a train, d = 50 m
Time taken, t = 120 s
We need to find the speed of a train. The formula for speed of an object is equal to the total distance covered divided by total time taken. It can be given by :

So, the speed of a train is 0.416 m/s.
Answer:
4 2/5
Step-by-step explanation:
11 7/10
- 7 3/10
----------------
4 4/10
4 4/10 = 4 2/5