Answer:
240 hours
Step-by-step explanation:
One person hour is a unit indicating the rate at which one person is working on the project .
The company estimates that it will take 2880 person- hours to complete the job
So let's determine how many hours it will take 12 workers to complete same job
The rate = 2880 person/hour
12 persons or workers =( 2880 person/hour)/12 persons
12 persons or workers = 2880/12
12 persons or workers=240 hours
It will take 12 workers 240 person hour to finish the project.
Thank you
Answer:
363.22
Step-by-step explanation:
<u>Method 1: </u>
You could find the whole figure surface area than divided by 1/2
<u>Method 2:</u> (the one I'm going to personally be doing)
Break the figure into two rectangular figures
Formula for surface area of rectangular prism:
A = 2(width x length + height x length + height x width)
Figure 1:
A = 2(width x length + height x length + height x width)
height = 3.8 yd
length = 10.1 yd
width = 4.3 yd
A = 2((4.3) x (10.1) + (3.8) x (10.1) + (3.8) x (4.3))
A = 2(98.15)
A = 196.3
Figure 2:
A = 2(width x length + height x length + height x width)
height = 8.4 yd
length = 10.1 yd
width = 2 yd
A = 2((2) x (10.1) + (8.4) x (10.1) + (8.4) x (2))
A = 2(121.84)
A = 243.68
There is overlapping surface area that shouldnt be include so we need to subtract it...
<u>For one face of figure 1</u>
3.8 x 10.1 = 38.38
Total:
Figure 1 + Figure 2 - 2(one face)
196.3 - 38.38 = 157.92
243.68 - 38.38 = 205.3
205.3 + 157.92 = 363.22
You will need. 1- to fit the rectangle tile in
Answer:
700 Dollars
Step-by-step explanation:
The expression for solving this is I = prt
So lets start with P, that is our principal or amount of money we start with, and we want to multiply it by our rate, or r , which is 3.5, so we would do 5000 x 0.035 to get 175, then we multiply that by our time or t, which is 4 years, so 175 x 4 = 700 dollars :D
Answer:
20cm squared
Step-by-step explanation: