1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Vlad1618 [11]
3 years ago
9

Find the z-score for a value of 16 with a mean of 8 and a variance of 5 g

Mathematics
1 answer:
zimovet [89]3 years ago
3 0
If the variance is 5 then the standard deviation is √5.
If Z is the score then Z=(8-16)/√5=-3.58 approx.
You might be interested in
Consider the following 8 numbers, where one labelled x is unknown. 24, 4, 1, x , 39, 5, 37, 48 Given that the range of the numbe
densk [106]

Answer:

yes

Step-by-step explanation:

7 0
3 years ago
Al graficar la siguiente función: f(x) = -3x
Anon25 [30]

Step-by-step explanation:

f(x) =  - 3x \\ at \: (0, \: 0) \\ f(0) =  - 3 \times 0 \\ f(0) = 0

6 0
3 years ago
A construction company is building a new parking garage and is charging the following rates: $5000 a month for the first 3 month
Elena L [17]

Answer:

C(t) = 5t for 0 < t ≤ 3

C(t) = (8t-9) for 3 < t ≤ 6

C(t) = 44 for 6 < t ≤ 10

C is given in thousands of dollars and t is given in months.

Total lump sum to be paid at the end of the 6 months for the total 10 months that the construction company works on the parking garage = $44000

Step-by-step explanation:

We will do a piecewise analysis for this cost function.

How to obtain the total cost changes with each time interval.

In the first 3 months,

C(t) = 5t for 0 < t ≤ 3

Note that C is given in thousands of dollars

In the next 3 months,

C(t) = (8t-9) for 3 < t ≤ 6

- Here, it gets a little complex, we use the upper limit of the previous interval and the lower limit of this new interval to get the constant to be subtracted from the normal 8t that characterizes this interval.

8(3) = 24

5(3) = 15

constant = 24 - 15 = 9

In the last 4 months,

C(t) = 44 for 6 < t ≤ 10

- For the last four months, it is a single sum of $5000 plus the [8(6) - 9] from the previous inteval

C = [8(6) - 9] + 5 = 39 + 5 = 44

So, the cost of parking, tracked month after month gives

T | Cost (in thousands of dollars)

1 | 5

2 | 10

3 | 15

4 | 23

5 | 31

6 | 39

7 | 44

8 | 44

9 | 44

10 | 44

Total lump sum to be paid at the end of the 6 months for the total 10 months that the construction company works on the parking garage = $44000

Hope this Helps!!!

8 0
3 years ago
One cubic foot is equal to 1728.0 cubic inches how many cubic inches are in 5 cubic feet
kow [346]

1 Cubic foot (cu ft) is equal to 1728 cubic inches (cu in). To convert cubic feet to cubic inches, multiply the cubic feet value by 1728. For example, to calculate how many cubic inches is 10 cubic feet of water, multiply 10 by 1728, that makes 17280 cu in is 10 cu ft of water.
5 0
3 years ago
I’m in dyer need of the answer to this problem please help!!
ElenaW [278]

Answer:

the x intercepts are -4 and -2

the y intercept are -2

Step-by-step explanation:

5 0
3 years ago
Other questions:
  • Consider 7x10 of the power of 3. Write a pattern to find the value of the expression.
    9·1 answer
  • What's the solution for 2x 7y=2 x y=-1
    7·1 answer
  • Which list contains three multiples of 4?
    14·1 answer
  • Translate the following arguments into symbolic form.If national elections deteriorate into TV popularity contests, then smooth-
    10·1 answer
  • Marcie wants to enclose her yard with a fence. your yard is in the shape of a rectangle attached to a triangle. the formula for
    12·1 answer
  • Find the area under the standard normal probability distribution between the following pairs of​ z-scores. a. z=0 and z=3.00 e.
    12·1 answer
  • Can someone help me please ?
    9·2 answers
  • Let ​f(x)= -5x+6. Find and simplify ​f(​3b-5).
    8·1 answer
  • Listen
    9·2 answers
  • Anyone tell me the answer
    5·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!