One worker<span> produces an average of 84 units per </span>day<span> with a street </span>What is the probability<span> that in any </span>single day worker 1 will outproduce worker 2<span>? A) 0.1141.
</span>
Answer, factory worker productivity<span> is </span>normally distributed<span>. </span>One worker produces<span> an </span>average<span> of 75 </span>units per day<span> with a standar, day with a </span>standard deviation<span> of 20. </span>Another worker produces<span> at an </span>average rate<span> of 65 </span><span>per day.
</span>
Answer:
0.5
Step-by-step explanation:
If you add 0.5 to -0.5, it will equal 0.
Answer:
12.68 if you are rounding to the hundreths place
Step-by-step explanation:
Answer:
1692.5 and -232.5
Step-by-step explanation:
Answer:
y= 3/5x+ 6.2
Step-by-step explanation:
the slope is change in y over change in x.
-4-(-1) divided by 3-8 will be -3/-5 = 3/5
For the y-intercept, plug in x and y values. I will use (3,8).
8= 3/5(3)+b
8= 9/5+b
(subtract 9/5 from both sides)= 6 and 1/5 or 6.2 as a decimal.