Answer:
You just play board game I will teach You What You dont know
The correct answer to your question is 20x+25
Answer:
a. The percentage of vehicles who pass through this construction zone who are exceeding the posted speed limit =90.82%
b. Percentage of vehicles travel through this construction zone with speeds between 50 mph and 55 mph= 2.28%
Step-by-step explanation:
We have to find
a) P(X>40)= 1- P(x=40)
Using the z statistic
Here
x= 40 mph
u= 44mph
σ= 3 mph
z=(40-44)/3=-1.33
From the z-table -1.67 = 0.9082
a) P(X>40)=
Probability exceeding the speed limit = 0.9082 = 90.82%
b) P(50<X<55)
Now
z1 = (50-44)/3 = 2
z2 = (55-44)/3= 3.67
Area for z>3.59 is almost equal to 1
From the z- table we get
P(55 < X < 60) = P((50-44)/3 < z < (55-44)/3)
= P(2 < z < 3.67)
= P(z<3.67) - P(z<2)
= 1 - 0.9772
= 0.0228
or 2.28%
Answer:

Step-by-step explanation:
One is given the following function (
). The given problem asks one to find the output of the function when the input is (10). Keep in mind, a general rule for dealing with functions is that, when present, the variable (x) represents the input. Whereas the variable (y) represents the output. Thus, if one were to substitute (10) in place of (x), and simplify: the result one would get is the output. Apply this idea to the given scenario:



