Basically what you have to do is substitute the variables for the values
-4+-9+5= -8
-2-3= -5
2= 2
6-4+1= 3
-9(-2+-4--3)= 27
Answer:
A. Would be your answer
Step-by-step explanation:
7 plus a number n is 7+n, so B and D are already incorrect.
The phrase “and then multiply” suggests parenthesis be around the numbers/variables you would need to do first, so that excludes C.
Making A. your only answer left
Hope I helped!
Answer:
0% probability that it would take exactly 3.7 hours to construct a soapbox derby car
Step-by-step explanation:
Problems of normally distributed samples are solved using the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
Also, the probability of finding an exact value in the normal probability distribution is 0.
So
0% probability that it would take exactly 3.7 hours to construct a soapbox derby car