Answer:
a. 32 secs
b. 3.75 or 4
Explanation:
The computation is shown below:
(a) Cycle Time is
= Operation time per week ÷ output per week
= (40 hours × 60 × 60) ÷ (4,500)
= 32 secs
(b) And, the Theoretical minimum number of workstations required is
= Sum of total task times ÷ cycle time
= (22 + 30 + 15 + 14 + 12 + 27) ÷ (32 sec)
= 3.75 or 4
By applying the above formulas we can get the cycle time and the theoretical minimum number of work stations
Answer:
engineering
Explanation:
if there is a break down the manager should be able to fix it using engineering.
Answer:
The answer is personal selling
Explanation:
_Personal Selling_______ is the two-way flow of communication between buyer and a seller that is designed to influence the buyer's purchase decision.
The answer is : Elastic Demand. The elasticity of demand shows the responsiveness of the quantity demanded to the change in price. An elastic demand means that the demand is affected by changes in price. While an inelastic demand means that the supply is not affected by changes in price at all.
Answer:
C. Reducing deposits and reserves by $5 million.