The answer is the second choice, or B; 240 ft^2.
You have to find the area of all four triangles and just add those all together.
Two of the triangles have an area of
5*16=80
Multiply that by two
80*2=160
The other two smaller triangles have an area of
8*5=40
Multiply that by 2 also
40*2=80
Add 160+80 and the answer is 240.
Answer: it’s b
Step-by-step explanation:
a-p-e-x quiz
Answer:
X= -5
Step-by-step explanation:
- You must move all constants to one side of the equation (one side of the equal sign) and away from 2x. To do so, you must do the inverse operation, which would be subtraction in this case because 3 is a positive number. (Inverse of addition is subtraction, Inverse of subtraction is addition, Inverse of multiplication is division, and inverse of division is multiplication) If you squish a constant and variable together (2x) it means multiplication.
- What you must do to one side, you must do to the other. So, since you subtracted 3 from the 3, you must subtract 3 from -7, too(subtracting from a negative is just addition- but you keep the negative sign). Once this is done, your equation will be 2x=-10
- Now, you must do the inverse operation to 2x to separate the 2. The inverse operation will be division. So, you divide both sides by 2. 2x divided by 2 will give you x. -10 divided by 2 will give you -5. (When you divided negative and positive numbers, the signs are different, meaning it's negative. If they had the same sign, it would be positive.)
- Therefore, your answer is x= -5
Hope I helped! :)
Sorry about the whole dang essay lol
Answer:
Z = -1.65
Step-by-step explanation:
Z-score:
In a set with mean
and standard deviation
, the z-score of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.
What is the critical value for the 5% significance level?
One-tailed statistic, so Z with a p-value of 0.05.
Looking at the z-table, this is Z = -1.65, so this is the critical value for the 5% significance leve.
Answer:
(‑1)/(2*x)+2 hope it helps :)