Answer:
The answer js 203 inches and this is the answer because the teacher said it js correct and it will be the correct one
Answer:
Sharika needs 2.5 days to finish the remaining work
Step-by-step explanation:
Sharika can do a work in 6 days palkey can do it in 8 days
Then the amount of work sharika can do in 1 day = 1/6
And the amount of work palkey can do in 1 day = 1/8
The amount of work both of them can do together in 1 day = 1/6 + 1/8
= 7/24
The amount of work both of them can do together in 2 day = (2× 7/24)
= 7/12
Since Palkey left the work,the amount of
work remaining for Sharika to do alone = (1 - 7/12 )
= 5/12
The number of days Sharika take to finish the remainig work. = (5/12 ÷ 1/6 )
= 5/2 days
Therefore, Sharika needs 2.5 days to finish the remaining work.
M=6/5 and n = sqrt(2), is rational (but not an integer) and n is irrational.
The case with n = sqrt(9)=3, is not a solution. The case with m=4pi neither.
The last case is m = 6/2=3, integer, so neither works.
So, it is the one with m=6/5 and sqrt(2)