The stage that precedes the implementation stage of SDLC is <u>testing</u> and it involves checking the functionality of the system.
System design involves the process of determining an overall system architecture, which typically comprises the following:
- Physical processing components.
Generally, there are seven (7) main stages in the systems development life cycle (SDLC) model and these include:
1. Planning.
2. Analysis.
3. Design.
4. Development.
5. Testing.
6. Implementation.
7. Maintenance.
From the above, we can deduce that the stage which precedes the implementation stage of SDLC is testing.
During the testing stage of SDLC, a quality assurance (QA) expert checks the system to determine whether or not it is functioning properly before it is deployed for operation, which is where the system can be used.
Read more: brainly.com/question/20813142
AMPERE - a unit of measure for the flow of the current in a circut
Answer:
The correct answer to the following question is Microwave ovens.
Explanation:
Because microwave ovens and the WIFI(Wireless Fidelity) both are operated at the same frequency that is 2.4 GHz.
It is not a magic, of course, logically explainable effects the radio waves. When the devices use WiFi signals to connect to the Internet then these signals are sent with the radio waves and despite all the advanced features of wireless interference can happen.
Answer: Zombies
Explanation: Zombie is a computer device that is responsible for the compromising the system and making it prone to several destruction such as the Trojan horse virus,hackers and other viruses as well. Zombie makes the computer system to get malfunctioned easily ,that is without much security and various malicious functions can be performed.They basically act as the infected computer .