Answer:
(a). 72.9%.
(b). 13.6 hr.
Step-by-step explanation:
So, we are given the following data or parameters or information which is going to assist us in solving this question/problem;
=> "A welder produces 7 welded assemblies during the first day on a new job, and the seventh assembly takes 45 minutes (unit time). "
=> The worker produces 10 welded assemblies on the second day, and the 10th assembly on the second day takes 30 minutes"
So, we will be making use of the Crawford learning curve model.
T(7) + 10 = T (17) = 30 min.
T(7) = T1(7)^b = 45.
T(17 ) = T1(17)^b = 30.
(T1) = 45/7^b = 30/17^b.
45/30 = 7^b/17^b = (7/17)^b.
1.5 = (0.41177)^b.
ln 1.5 = b ln 0.41177.
0.40547 = -0.8873 b.
b = - 0.45696.
=> 2^ -0.45696 = 0.7285.
= 72.9%.
(b). T1= 45/7^ - 045696 = 109.5 hr.
V(TT)(17) = 109.5 {(17.51^ - 0.45696 – 0.51^ - 0.45696) / (1 - 0.45696)} .
V(TT) (17) = 109.5 {(4.7317 - 0.6863) / 0.54304} .
= 815.7 min .
= 13.595 hr.
10t = b - 4
12b+8t = $348
This is a system of equations. I’ll be solving through substitution.
In the first equation. solving for b (the easier variable to isolate) gives you:
b = 10t + 4
Substitute this into the second equation:
12(10t+4) +8t = 348
120t+48+8t = 348
128t = 300
t = 2.34375 —> round it to the nearest cent to get 2.34 dollars
b = 10t+4
b = 10(2.34)+4
b = 27.4 dollars
Answer:
yes
Step-by-step explanation:
three is a factor of 12 because you can multiply it by 4 and you get 12 (a factor is a number you can multiply by another to give you a product)
Answer:
i believe it's 18
Step-by-step explanation:
9/6=1.5
27/1.5= 18