1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
alina1380 [7]
4 years ago
15

Solving by factoring

Mathematics
1 answer:
puteri [66]4 years ago
6 0

Answer:

3

Step-by-step explanation:

You might be interested in
Which of the following is the graph of y= - x + 1
Ksivusya [100]

Answer:

See picture below

Step-by-step explanation:

To graph properly, remember that:

  • The y intercept of the function, is the value of the function when x=0, and tells (in this case y=1 is the intercept). Locate this point in the graph.
  • The x intercept, which is the value of x when y=0 is x=1. Locate it in the graph.
  • You now have two points of a straight line: join this two points and you would have done it!

5 0
3 years ago
A baseball coach gives half his players an energy drink to consume before each game; the other half does not receive the energy
lilavasa [31]
He would have to not give them energy drings and give the other half energy drings to see how they improve.
7 0
3 years ago
What is 7/10+20/100?
Firdavs [7]
9/10. make the bottom numbers the same to add fractions. you can do that by multiplying 7/10 by 10/10.

70/100 + 20/100 = 90/100

90/100 = 9/10

you can also reduce 20/100 to 2/10.

7/10 + 2/10 = 9/10
8 0
3 years ago
Read 2 more answers
When water leaks through a hole, friction and contraction of the stream near the hole reduce the volume of water leaving the tan
Romashka [77]

Answer:

The explanation is given in the attachment.

Step-by-step explanation:

The step by step explanation and careful derivation is as shown in the attachment.

3 0
4 years ago
It will take five builders 62 days to complete a particular project. At this rate, how long would the project take if there were
Lena [83]

Answer:

2 builder complete work = 155 days

Step-by-step explanation:

Given:

5 builder complete work = 62 days

So,

1 builder complete work = 62 days × 5

if,

2 builder complete work = [62 days × 5] / 2

2 builder complete work = 155 days

6 0
3 years ago
Other questions:
  • When the equation 2x+15−−−−−−√−x=0 is solved correctly, the solutions are x=−3 and x=5.
    10·1 answer
  • Helpppppp me please!!!!
    11·2 answers
  • Select the correct answer.
    15·2 answers
  • Which of the points shown below are on the line given by the equation
    6·1 answer
  • A spinner has two equal
    9·1 answer
  • Whic decimal is equivalent to 5.05? 50.05 or 5.5 or 5.050 or 50.5
    14·2 answers
  • Write the fraction as a decimal. Round to the nearest hundredth, if necessary. <br> 7/8
    15·2 answers
  • The track team washed 24 cars in 3 hours. How many cars can the team wash in 5 hours?
    9·1 answer
  • 2.<br> What is the equation of a hyperbola with a = 8 and c=20
    15·1 answer
  • Martika surfs with her friends at Virginia Beach. Her friend, Mark, caught 8 waves out of 20 possible waves to ride in to shore.
    12·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!