Answer:
1 and 2.
Midpoints calculated, plotted and connected to make the triangle DEF, see the attached.
- D= (-2, 2), E = (-1, -2), F = (-4, -1)
3.
As per definition, midsegment is parallel to a side.
Parallel lines have same slope.
<u>Find slopes of FD and CB and compare. </u>
- m(FD) = (2 - (-1))/(-2 -(-4)) = 3/2
- m(CB) = (1 - (-5))/(1 - (-3)) = 6/4 = 3/2
- As we see the slopes are same
<u>Find the slopes of FE and AB and compare.</u>
- m(FE) = (-2 - (- 1))/(-1 - (-4)) = -1/3
- m(AB) = (1 - 3)/(1 - (-5)) = -2/6 = -1/3
- Slopes are same
<u>Find the slopes of DE and AC and compare.</u>
- m(DE) = (-2 - 2)/(-1 - (-2)) = -4/1 = -4
- m(AC) = (-5 - 3)/(-3 - (-5)) = -8/2 = -4
- Slopes are same
4.
As per definition, midsegment is half the parallel side.
<u>We'll show that FD = 1/2CB</u>
- FD =
=
= 
- CB =
=
= 2
- As we see FD = 1/2CB
<u>FE = 1/2AB</u>
- FE =
=
= 
- AB =
=
= 2
- As we see FE = 1/2AB
<u>DE = 1/2AC</u>
- DE =
=
= 
- AC =
=
= 2
- As we see DE = 1/2AC
ANSWER
A. -3, -2, 2, and 3
EXPLANATION
The given polynomial function is,

To find the real roots, we equate the function to zero to obtain;

We can solve this equation as a quadratic equation in

Thus we rewrite the equation as,

We split the middle term to get,

We factor to get,

We factor to get,

Either

or




The correct answer is A
The given line has a slope of -1 so the perpendicular line will have a slope of -1/1=1
y=x+5
4: A school has 314 boys & 310 girls. If they are to be grouped into equal classes of 26 each , how many classes will there be?
314 boys + 310 girls = 624
If they are grouped into classes of 26 students each, how many class will there be?
130 students = 5 classes
Therefore
260 students = 10 classes
260 x 2 = 520 = 20 classes
26 x 24 = 624
Number of classes = 24
Question 5).
Jim worked 48 weeks last year. Each week he worked 38 hours. If he worked an additional 240 hours of overtime, how many hours did he work in all?
Solution:
48 weeks
24hrs × 7 = 168hrs
168 x 48 = 8,064
Additional 240hrs
= 168hrs = 7 days (a week)
240hrs - 168 = 72 (3days)
168 + 72
= 240hrs + 8, 064
= 8, 304 hrs
Answer:
95.69
Step-by-step explanation:
two sweaters costs 27.34 then one would cost 13.67
7×13.67 = 95.67